INSTALL THE PERFORATED BLAST CABINET FLOOR

•  Let the Blasting Gun and Hoses hang out of the right front 

corner of the Blast Cabinet.

•  Insert the Perforated Floor Panel 

[F]

 through one of the Blast 

Cabinet side openings with the angled cut off corner toward 
the right front of the Cabinet to allow space for the hoses

 

(FIG 9

). Rest the edges on the internal support flanges.

MOUNT THE AIR REGULATOR/FOOT PEDAL ASSEMBLY

•  Set the Air Regulator in place on the upper front face of the 

left leg, align the mounting holes of the bracket with the two 
holes in the Leg and secure it by installing two M6 x 12mm 
Pan Head  Screws

 [M]

 and M6 Serrated Flange Nuts 

[N] 

(FIG 10)

.

MOUNT THE ANTI-PURGE VALVE

•  Install the Anti-Purge Valve by installing three M6 x 12mm 

Pan Head  Screws 

[M]

 and M6 Serrated Flange Nuts 

[N]

 

through the hinge into the back of the Blast Cabinet  

(FIG 11)

.

•  Use the latch on the front of the Blast Cabinet to lock the 

Anti-Purge Valve door closed 

(FIG 12)

.

•  Verify the latch is creating adequate pressure on the seal so 

that media does not leak. If not, adjust the latch clockwise 
to increase pressure 

(FIG 12)

 until the seal is adequate and 

media will not leak.

FIG. 11

FIG. 11

Angled cut-off corner for Hose clearance 

Angled cut-off corner for Hose clearance 

(front right of Blast Cabinet)

(front right of Blast Cabinet)

Air Regulator 

Air Regulator 

screw holes

screw holes

Anti-Purge Valve 

Anti-Purge Valve 

screw holes

screw holes

Closed

Closed

Rotate clockwise to  

Rotate clockwise to  

increase tension

increase tension

Summary of Contents for B120

Page 1: ...B120 ABRASIVE MEDIA BLAST CABINET ASSEMBLY AND OPERATING INSTRUCTIONS Item 66294...

Page 2: ...Tape Roll J 2 Nozzle 6mm one pre installed K 2 Nozzle 7mm L 44 M6 x 12mm Pan Head Screw M 44 M6 Serrated Flange Nut N 1 Sealing Foam Roll P 4 Side Door Hinge Half Q 2 Side Door Latch Strike Plate R 1...

Page 3: ...zards Always make sure the vacuum is operating and the Top Lid and Side Doors are closed and latched before blasting Failure to maintain the vacuum unit can result in dust seeping out This is a seriou...

Page 4: ...sent in coatings being removed Additional protection may be required in the presence of these substances Air hoses and power cords pose a tripping hazard Blast media buildup on the floor can be very s...

Page 5: ...place at the underside of the roof of the Cabinet Carefully withdraw the Light Fixture from the Blast Cabinet Set the Light Fixture aside in a secure location along with the screws removed for instal...

Page 6: ...sable to have a helper support the Leg while aligning holes and installing hardware Insert four M6 x 12mm Pan Head Screws M from the outside and add M6 Serrated Flange Nuts N FIG 3 Repeat for front an...

Page 7: ...e protective film covered side toward the interior of the Blast Cabinet FIG 7 Place the Light Fixture with Switch facing forward on top of the Glass Lamp Panel U and align the six mounting slots to th...

Page 8: ...an Head Screws M and M6 Serrated Flange Nuts N FIG 10 MOUNT THE ANTI PURGE VALVE Install the Anti Purge Valve by installing three M6 x 12mm Pan Head Screws M and M6 Serrated Flange Nuts N through the...

Page 9: ...upplied Locknut FIG 13b With the assistance of a helper align the mounting holes of the brackets with the four holes at the right rear wall of the Blast Cabinet Secure it in place using four M6 x 12mm...

Page 10: ...for set up BLAST CABINET SET UP Add Eastwood approved Blast Media Fill to within 10 of the Perforated Floor support flanges DO NOT OVERFILL Overfilling will degrade performance DO NOT USE SAND IN THIS...

Page 11: ...spect them for any damage before each use If damage is observed immediately discontinue use and replace the glove Abrasive blasting can also pose serious health hazards to bystanders Always make sure...

Page 12: ...NOTE Avoid angles of 90 ricochet causes excess Nozzle and Viewing Glass wear or less than 30 media tends to glance off workpiece Adjust the Anti Purge Valve screw to the halfway position as a baseline...

Page 13: ...hread the Nozzle Ferrule back in place FIG 19 The Blast Gun is now once again ready for use JET REPLACEMENT Replace the Jet when you notice excessive air and blast media being used or blasting efficie...

Page 14: ...irst turn off the Vacuum unit and unplug the power supply cord Release the side latches of the Vacuum Filter Assembly and pull the Motor Filter out of the top of the Housing and set it upside down wit...

Page 15: ...ure separator capable of removing all moisture and impurities from the air supply The Eastwood 34103 Moisture Separator not included works well to remove moisture Debris or Blasting Residue in Blastin...

Page 16: ...ss 21301 66294 30999 Eastwood Replacement Filter for Dust Collector 66295 Eastwood B120 Side Door Seal 66294 66296 Eastwood B120 Blast Gun Hose Set 66294 66297 Eastwood B120 Anti Purge Valve 66294 662...

Reviews: