EASTRON SDM630MCT-RJV / SDM630MCT-RJA User Manual V1.1
Address: No.1369 Chengnan Road, Jiaxing, Zhejiang, 314001, China.
Tel: 0086-573-83698881/83698882 Fax: 0086-573-83698883 Web: www.eastron.com.cn
- 10 -
DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated for
maximum demand measurement. The options are: off, 5, 8, 10, 15, 20, 30, 60 minutes
1
From the set-up menu, use
and
buttons to select the DIT option.
The screen will show the currently
selected integration time.
2-1
Press
to enter the selection
routine. The current time interval will
flash
2-2
Use
and
to select the time
required.
2-3
Press
to confirm the selection.
SET indicator will appear.
Press
to exit the DIT selection routine and return to the menu.