JIAXING EASTRON ELECTRONIC INSTRUMENTS CO.,LTD.
TEL:0086-573-83698881
83698882
FAX: 0086-573-83698883
WEB:
www.eastrongroup.com
Email:
Add: No.1369. Chengnan Road, Nanhu, Jiaxing, Zhejiang, China 314001.
- 16 -
2
Press
to enter the CT primary current
selection routine. The first digit will flash.
3
Use the method described in section 4.2.2 to set the 4-digit number to the maximum CT primary
current, e.g. 500A
4
On Completion of the entry procedure, press
to return to the main set up menu.
5.
Secondary CT setting
The setting method is same as Primary Current setting
CT1
4.7
4.7
4.7
4.7 PT
PT
PT
PT
The PT option sets the primary voltage (PT1 100~500000V) and secondary voltage (PT2 100~500V) of the
Voltage transformer (PT) that wires to the meter. The default value is 230V for both primary and secondary
voltage.
1
From the Set-up menu, use
and
buttons to select the PT option. The screen will show
the voltage PT primary voltage value.