JIAXING EASTRON ELECTRONIC INSTRUMENTS CO.,LTD.
TEL:0086-573-83698881
83698882
FAX: 0086-573-83698883
WEB:
www.eastrongroup.com
Email:
Add: No.1369. Chengnan Road, Nanhu, Jiaxing, Zhejiang, China 314001.
- 14 -
1
From the set-up menu, use
and
buttons
to select the dIT option. The screen will show the
currently selected integration time.
2
Press
to enter the selection routine. The current
time interval will flash
3
Use
and
buttons to select the time
required.
4
Press
to confirm the selection. SET indicator will
appear.
5
Press
to exit the dIT selection routine and return to the menu.
4.5
4.5
4.5
4.5 Supply
Supply
Supply
Supply System
System
System
System
Use this section to set the type of power supply being monitored.
1
From the Set-up menu, use
and
buttons to select the System option. The screen will
show the currently selected power supply .