26
Form E-564
Eastman
®
Plastic Overlay Replacement
NOTE: 1. Plastic Overlay Roll weigh Approximately
150lbs.
2. Two people are required for Plastic Overlay
replacement.
1. Unhook leather strap.
2. With one person on each side of the machine,
lift up the overlay bar and empty plastic overlay
core and set it on flat surface.
Leather
Strap
Plastic
Overlay Roll
3. Loosen the Shaft Collar Screw and remove large
core stop disk.
4. Remove the empty core and discard.
5. Place bar into new Roll and reassemble
in reverse order.
Shaft
Collar
Screw
Core Stop
Disk
Failure to follow procedure may result in serious
personal injury.
WARNING