16 Operation
Check Tension
Check the tape for correct
tension. Tighten or loosen
the tape core holder to adjust
tension.
Thread Tape
Carefully thread the new tape through the rollers in the tape head as shown in the
applicable diagram in the Tape Head User Guide provided with the tape head.
For convenience, diagrams for threading tape in the Eastey-EX Tape Head and EZ-EX
Tape Head are provided on the following page. Follow the diagram that applies for your
tape head, depending on the tape head model and position on the taper.
Summary of Contents for SB-2EX
Page 1: ...SB 2 3EX Standard Stainless Industrial Case Taping System User Guide...
Page 2: ......
Page 4: ......
Page 6: ......
Page 10: ...10 Introduction Dimensions Dimensions are shown in inches...
Page 14: ...14 Installation...
Page 26: ...26 Maintenance...
Page 29: ...Illustrated Parts List 29 Parts List Electrical...
Page 30: ...30 Illustrated Parts List Electrical Layout 11 12 17 18 16 19 20 14 13 15...
Page 31: ...Illustrated Parts List 31 Electrical Layout Cont...
Page 33: ...Illustrated Parts List 33 Side Belt Assembly...
Page 38: ...38 Illustrated Parts List Vertical Column...
Page 43: ...Illustrated Parts List 43 Machine Body...
Page 50: ......