![Eastey ET2008 User Manual Download Page 36](http://html1.mh-extra.com/html/eastey/et2008/et2008_user-manual_3498039036.webp)
36 Maintenance
Step 5 – Check Entire Belt Circuit
•
Z-bends should not come into contact with any conveyor component (including end
rolls, wear strips, transfer support rails, nose bars, etc.)
•
Adjust as needed.
Step 6 – Adjust Tension
•
The wire belt used is a low-tension belt. Use minimal tension — only enough so the
sprockets properly engage the belt.
•
Run the conveyor and check to make sure it runs smoothly.
Note:
Too much tension will cause premature belt failure.
Summary of Contents for ET2008
Page 2: ......
Page 4: ......
Page 6: ......
Page 43: ...Parts List 43 Parts List Electrical Eastey Bundling Shrink Tunnel Part No Description...
Page 44: ...44 Parts List Part No Description...
Page 45: ...Parts List 45 Mechanical Hood Parts Part No Description...
Page 46: ...46 Parts List Conveyor Parts Part No Description...
Page 47: ...Parts List 47 Part No Description...
Page 48: ...48 Parts List...
Page 53: ...Appendix A Electrical Schematic 53...
Page 57: ......