![Eastey ET2008 User Manual Download Page 28](http://html1.mh-extra.com/html/eastey/et2008/et2008_user-manual_3498039028.webp)
28 Maintenance
For the second option (to replace entire controller and receptacle), first take note of wire
locations (make a sketch and label the wires with tape, if necessary), and then
disconnect wires from the temperature controller and thermocouple. Slide the controller
and receptacle out of the front of the panel. Replace with a new controller and
reconnect wires to the temperature controller and thermocouple. (Refer to notes made
during disassembly or the electrical schematic if necessary.)
Warning:
If there is no control over heat, interchange the thermocouple wires.
Caution:
Do not exceed 500 degrees.
Blower motor replacement
Shut off power to the machine. Remove the top lid on the hood of the tunnel.
Disconnect the wires on the blower motor(s). (Note: there may be more than one blower
motor.) Remove four (4) 5/16-18 bolts on the motor mount(s). Once the blower housing
is out and on the bench, loosen the two (2) set screws holding the blower wheel in
place. The blower wheel shaft set screws are installed with thread-locking compound
and may require a torch to remove the blower wheel — if force is necessary, apply it
between the motor and blower wheel hub. Remove the motor mount bolts and remove
PV
SV
Summary of Contents for ET2008
Page 2: ......
Page 4: ......
Page 6: ......
Page 43: ...Parts List 43 Parts List Electrical Eastey Bundling Shrink Tunnel Part No Description...
Page 44: ...44 Parts List Part No Description...
Page 45: ...Parts List 45 Mechanical Hood Parts Part No Description...
Page 46: ...46 Parts List Conveyor Parts Part No Description...
Page 47: ...Parts List 47 Part No Description...
Page 48: ...48 Parts List...
Page 53: ...Appendix A Electrical Schematic 53...
Page 57: ......