![Eastey ET2008 User Manual Download Page 35](http://html1.mh-extra.com/html/eastey/et2008/et2008_user-manual_3498039035.webp)
Maintenance 35
Step 3 – Weave the strand to the other side
1. Repeat the steps in Step 2, going in the opposite direction, weaving to the other
side edge of the belt as shown in the following illustrations.
2. If you are installing a new belt, you are finished splicing.
Step 4 – Check Drive Shaft Sprocket Alignment
•
Check to ensure 3/16-inch clearance between all sprockets (and/or blanks) and the
Z-bends next to them.
•
Check alignment of sprocket teeth with a straight-edge. (Only necessary if the
sprockets are not keyed to the drive shaft.)
A
C
E
B
D
1
3
5
2
4
A
E
B
D
C
1
5
2
4
3
A
E
C
B
D
2
4
1
5
3
Summary of Contents for ET2008
Page 2: ......
Page 4: ......
Page 6: ......
Page 43: ...Parts List 43 Parts List Electrical Eastey Bundling Shrink Tunnel Part No Description...
Page 44: ...44 Parts List Part No Description...
Page 45: ...Parts List 45 Mechanical Hood Parts Part No Description...
Page 46: ...46 Parts List Conveyor Parts Part No Description...
Page 47: ...Parts List 47 Part No Description...
Page 48: ...48 Parts List...
Page 53: ...Appendix A Electrical Schematic 53...
Page 57: ......