![Eastern Jungle Gym ULTIMATE Owner'S Instruction Manual Download Page 17](http://html1.mh-extra.com/html/eastern-jungle-gym/ultimate/ultimate_owners-instruction-manual_3467548017.webp)
Ladder Side WALL Installation Step #12
Activity Wall #2
R2455
Place wall board, R2455 from inside
clubhouse flush with top of post and
fasten with 2-3” lags on each side.
R2429
Place ½ wall rail R2429 flush
with edge of post and fasten
with 2-3” lags.
Place clubhouse center rail
CR4446 flush with top of rail
and fasten with 2-3” lags.
Fasten clubhouse center rail
CR4446 flush with 2-3” lags
from under deck.
W
B
5
4
4
4
0
Place wall board Wb54440
from outside of clubhouse
3½” in from post and flush
with bottom of floor and rail
just installed (as shown in
photo). Install with 2 1-3/4”
screws
on top and bottom.
20