![Eastern Jungle Gym ULTIMATE Owner'S Instruction Manual Download Page 11](http://html1.mh-extra.com/html/eastern-jungle-gym/ultimate/ultimate_owners-instruction-manual_3467548011.webp)
FLOOR Installation Step #5
Place floor on post teaks that you leveled earlier.
At this point all four post and floor should be level.
NOTE: Make sure floor orientation match ground
support base orientation when placing floor on
post.
Pull post tight to floor making sure that the
floor is resting on 2x4 teaks. Now install
with 2 - 3” lags in each corner.
From under the clubhouse lag the floor
into post in all four corners using 2 - 3”
lags.
Clubhouse floor is completed!
14