background image

Place rock wall into back opening. 
Hold top of rock wall flush with top 
of floor (as shown in photo).

From under the clubhouse 
fasten rock wall to post 
using 
1 - 3” lag on each side (as 
shown in photo).

Rock wall complete!

Ultimate ROCK WALL installation Step #10

Layout Sa4494 swing arm with counter sink holes 
facing up.  (as shown in photo).

Place swing hangers on beam using hardware 
provided. Notice how the hangers are mounted on 
swing arm.  (as shown in photo).

4 @ 3/8” Hex Bolt
8 @ 3/8” Washer
4 @ 3/8” Lock Nut
2 @ Swing Hangers

Mount swing arm onto clubhouse above 
rock wall using 2 - 5” lags on each side. 
The swing arm gets mounted under the 
wall top rails (as shown in photo). Swing 
Arm should point out the same direction 
as the slide wall opening. 

Slide Wall

OPTIONAL SWING ARM Assembly Step #11

19

Summary of Contents for ULTIMATE

Page 1: ...be used exclusively for Eastern Jungle Gym customers only It is not to be handed out to the general public Any duplication of this booklet will be subject to copyright protection and federal laws Crea...

Page 2: ...you to go through your boxes and check all material hardware and wood prior to building So that you can familiarize yourself with the material Also it is very helpful to read and look over this instru...

Page 3: ...ther than sitting on swings is dangerous and can cause serious injury Never stand or kneel on swings 11 Warn children to not loop chains over any object this can cause the chain to weaken 12 Children...

Page 4: ...er throughly reading all your information and have located your swing set site Carefully unpack all your parts NOTE keep check list close by Remember that a little time familiarizing your self with th...

Page 5: ...Hangers 7 Ladder Rungs Bag of Rocks with Hardware 2 Green Sling Swings Safety Grab Handles 3 Sections Rope 1 Ring Trap Combo Items not shown 1 Tent top 1 Binoculars 1 Captains Ships Wheel 1 Swing Beam...

Page 6: ...SSEMBLY All Recessed holes must be piloted with 1 4 drill bit to help minimize splintering All lag bolts must be accompanied with a washer before driving in lag bolt Now you are ready to begin assembl...

Page 7: ...holes in R2655 should face the inside of box The counter sink holes on Gs2655 should face outside of box Measure from corner to corner on each side of ground support base Make sure your measurements a...

Page 8: ...4 posts NOTE Mark the longer side with an X Now place PT246 floor teak supports over X with edge on line drawn Install with 2 3 lags Continue on all 4 posts NOTE The 46 side is the TOP of post mark w...

Page 9: ...Using first post as a guide place level on PT246 floor teak mounted on post Dig down second post until level with first post Again fasten with 4 3 lags in holes provided Continue this process until a...

Page 10: ...each side R2455 FT2455 F J 2 6 5 5 Stand up floor joist on end and install with 1 3 lag through Fj2655 into R6455 Use the 3 and 5 marks you made earlier as guides NOTE The counter sink holes in R2655...

Page 11: ...NOTE Make sure floor orientation match ground support base orientation when placing floor on post Pull post tight to floor making sure that the floor is resting on 2x4 teaks Now install with 2 3 lags...

Page 12: ...nd bottom Make sure you level your tent support 4x4 before installing lags SLIDE Wall WR2496 R2429 20 Layout 3 WB54440 wall boards on the inside of clubhouse against rails just installed Measure 3 in...

Page 13: ...nter of WR2455 Using 2 3 lags top and bottom Make sure you level your tent support 4x4 before installing lags Layout 6 WB54440 wall boards on the inside of clubhouse against rails just installed Measu...

Page 14: ...ush with bottom of floor and rail just installed as shown in photo Install with 2 1 3 4 screws on top and Place wall board Gh2446 from outside of clubhouse 1 in from wall board Wb54446 and flush with...

Page 15: ...tion remove rocks and drill holes using a 3 8 drill bit After you have drilled out all the holes you can start rock installation Continue decking your rock wall using FB54648 until it is completed as...

Page 16: ...er sink holes facing up as shown in photo Place swing hangers on beam using hardware provided Notice how the hangers are mounted on swing arm as shown in photo 4 3 8 Hex Bolt 8 3 8 Washer 4 3 8 Lock N...

Page 17: ...with edge of post and fasten with 2 3 lags Place clubhouse center rail CR4446 flush with top of rail and fasten with 2 3 lags Fasten clubhouse center rail CR4446 flush with 2 3 lags from under deck W...

Page 18: ...7 rungs are screwed in Ladder is now complete Install JB4458 Jacobs Ladder Bottom rail to the ladder Make sure to leave 3 overhang on the right side of ladder and flush with the bottom Notice all hole...

Page 19: ...If installing Wood Roof ADD ON Skip Step 17 and go to Wood Roof ADD ON manual Tent Top Rail Mount first TR2464 tent rail across the wall top rails Above the rock wall Install with 1 3 lag on each side...

Page 20: ...7 JD2426 Jacob Ladder Rungs and 3 ropes as shown in photo Thread rope through Jacobs Ladder top rail JT4484 and knot on the top as shown in photo Thread 3 ropes through first JD2426 Jacobs Ladder run...

Page 21: ...SWING BEAM Assembly Step 19 Layout CB46114 Swing Beam on the ground 24 Place swing hangers on beam using hardware provided 12 3 8 Hex Bolt 6 24 3 8 Washer 12 3 8 Nut 6 Swing Hangers...

Page 22: ...bolt through TS4484 into swing beam using 2 5 Lag bolts 7 8 Counter Sink Holes on Swing beam into tent support T S 4 4 8 4 Swing Beam 7 8 Counter Sink Holes on Swing beam Slide each SS44120 Side Supp...

Page 23: ...nder floor where slide opening is using 2 screws as shown in photo SLIDE Installation Step 21 26 Position slide in slide wall opening Drill pilot holes at top of slide with 1 4 drill bit and secure wi...

Page 24: ...lide opening as shown in photo Use the hardware provided for Congratulations you are Finished Accessory Installation Step 22 Install 2 pair of grab handles above rock wall and ladder Measure up from f...

Page 25: ...d 4x6 Timbers Seasonal checks cracks are the separation of the wooden fibers running from the center heart which is the strongest part of the tree Since all our material is kiln dried for the absolute...

Page 26: ...In addition for a period of Fifteen Years from the date of purchase EJG warrants to...

Page 27: ...Customer Service available 9 5pm EST Mon Fri call 877 543 4969...

Reviews: