![background image](http://html1.mh-extra.com/html/eastern-jungle-gym/classic-tire/classic-tire_owners-instruction-manual_3465672014.webp)
Step #6- Swing Beam Leveling Classic Tire
13
With the help of another person turn swing beam assembly
upright. Level swing beam as needed by digging the side
support legs into the ground.
Check with level
Four metal stakes are provided for added stability.
After swing beam is installed insert stakes into the
ground flush with support legs. Leave 6” exposed
and bolt to support using two B3 lag bolts.
Summary of Contents for Classic tire
Page 1: ...Owners Instruction Manual 2021...
Page 3: ...2...
Page 5: ...4...
Page 8: ...7...
Page 16: ...15...
Page 17: ...16 Customer Service available 9 5pm EST Mon Fri call 1 800 752 9787...
Page 18: ...17...
Page 19: ...18...