Step #5a Monkey Bar Install Option 2 5ft Monkey Bars
Place Monkey Bar
assembly through
bars in ½ wall. Level
as needed. Install
into post and tent
top support using B5
bolts.
Two metal stakes are provided for added
stability. After swing beam is installed insert
stakes into the ground flush with support legs.
Leave 6” exposed and bolt to support using
two B3 lag bolts.
11
Only for Straight Base models
Summary of Contents for 5' MONKEY BARS
Page 1: ...Owners Instruction Manual...
Page 2: ...1...
Page 3: ...2...
Page 5: ...4...
Page 6: ...Accessories Identification 1 Roll of electrical tape 5...
Page 8: ...7...
Page 14: ...12...
Page 15: ...13...
Page 16: ...14...
Page 17: ...15...