18
1.
Strip the individual wires by 12 mm. If the cable has
flexible conductors, it is recommended to use ferrules
on stranded wires. Use correct tools to press them.
2.
Tighten the screw terminal with a torque of 5 Nm.
NOTICE!
When connecting multiple backplates in
parallel, each screw terminal serves as a coupling
point for adjacent backplates. All backplates must be
connected with the same phase sequence. External
junction boxes or flat cables can be used if it is more
convenient.
NOTICE!
It's recommended to follow the existing colour
codes used in the installation. Depending on national
standards, the colours of the cables can vary from the
illustrations. The illustrations in this manual follow the
IEC 60446 standard.
NOTICE!
Before turning on the power, make sure the
wires are properly connected and tightened. Test this by
pulling on each wire.
Power Rail
Wiring
3
PE
PE
N
L1
–
–
PE
N
L1
L2
L3
PE
L1
L2
–
–
PE
L1
L2
L3
–
2
1
(230 V)
(230/400 V)
(230 V)
(230 V)
TN 1-phase
TN/TT 3-phase
IT/TT 1-phase
IT/TT 3-phase