2
3
4
6
7
8
9
10
11
Mark Points:
•
Mark a point
(1)
on the horizontal line
A, 80
mm to the vertical reference line.
•
Repeat this operation on the other side and
on the vertical reference line, checking that
the three marks are leveled.
•
Mark a point
(2)
on the horizontal line
B, 60
mm to the vertical reference line.
•
Repeat this operation on the other side,
checking that the two marks are on the
same horizontal line.
•
Mark a point
(3)
on the horizontal line
C, 100
mm to the vertical reference line . Repeat this
operation on the other side , checking that the
two marks are leveled.
Fix the brackets :
•
Drill holes at the marked points with a ɸ10
mm drill bit.
•
Insert the Wall Plugs 11 into the holes.
•
Fix the hood fixing bracket
20
with 3 screws
10
(5 x 50) at the horizontal line A.
•
Fix Chimney fixing bracket
21
with 2
screws
10
(5 x 50) at the horizontal line B
29
V.1