PAGE 3
1/4 - 20 Locknut
1/4 - 20 x 1-1/2” Bolt
1/4 - 20 x 1-1/2” Bolt
1/4 - 20
Locknut
Gauge & Linkage Assembly
Control Lever
& Gauge
12.
CALIBRATION:
This step ensures that your spreader is
properly adjusted to give you a correct starting point to apply
materials at the correct setting.
Pull the Control Lever back to #30 on
the Gauge, then push the shut-off plate forward until the shut-off and the drop holes
are fully open. Now tighten the Hex Nut on the ½” Carriage Bolt on the Linkage
Assembly. Check to confirm calibration by closing the Control Lever, then reopening
to #30 and confirm that the drop holes are fully open.
13.
Insert agitator to pinion shaft on inside of hopper.
NOTE:
Position of flat side of the agitator as shown at the
right.
10.
Attach Linkage Pivot with 1/4-20 x 1½” Hex Bolt,
Flat Washer, Spacer and Locknut as shown below.
Next
, install Control Rod into the Shut-Off Plate as
shown at the right.
TIP:
Make sure that the Control
Rod is above the Lower Handles.
60088
Gauge & Linkage
12147
Spacer
32103
1/4-20 Locknut
31100
1/4-20 X 1-1/2" Bolt
and 34108 Washer
41256
Control
Rod
36500
1/2” Carriage
Bolt
34100
Washer
32108
Hex Nut
60088
Linkage
12317
Shut-off
Plate
41256
Control
Rod
25304
Handle Shaft
12317
Shut-Off
Plate
60088
Linkage
32108
Hex Nut
34100
Washer
41256
Control
Rod
11.
Using ½” Carriage Bolt, install through the Control Rod, Linkage and install the
Flat Washer and secure with Hex Nut to a loose fit to allow for
CALIBRATION
below. See above right and below for details.