background image

 1

QuickStart Guide: 

A) Getting Started Sleep on Command v.5  / v.5Pro; 

Contents:

• Sleep on Command™ v.5  or  v.5Pro controller

• power supply 100 - 240 volt AC to 12 volt DC

• one modular electromagnet (v.5) or two electromagnets (v.5Pro)

• international pin adapter for your shipping location

• padded carrying-case

1)  Please  complete  at  least  one

 

Resting-Breath-Hold  (RBH)

 

test 

according to instructions BEFORE your initial session. 

2) Plug the POWER-SUPPLY into wall outlet (100 - 240 volts AC / 50 

or 60 Hz). Use international pin adapter if required.

3) Plug power-supply cable into the large jack on back of control unit. 

Reviews: