SCW-410-QS (05/12)
Disclaimer
Proper installation and servicing of the EarthLinked
®
Heating and Cooling System is essential to its
reliable performance. All EarthLinked
®
systems must be installed and serviced by an authorized,
trained technician who has successfully completed the training class and passed the final
examination. Installation and service must be made in accordance with the instructions set forth in
this manual and the current
EarthLinked Heating and Cooling Systems Installation, Operation and
Maintenance Manual.
Failure to provide installation and service by an authorized, trained installer
in a manner consistent with the subject manuals will void and nullify the limited warranty coverage
for the system.
READ THE CURRENT EarthLinked Heating and Cooling Installation, Operation and
Maintenance Manual FOR COMPLETE INSTALLATION DETAILS.
Earthlinked
Technologies shall not be liable for any defect, unsatisfactory performance, damage or
loss, whether direct or consequential, relative to the design, manufacture, construction, application
or installation of the field specified components.
Earthlinked Technologies, Inc.
4151 South Pipkin Road
Lakeland, Florida 33811
tel. 863-701-
0096 ● fax 863-701-7796
info@earthlinked
CSI # 23 80 00
Summary of Contents for SCW Series
Page 8: ...SCW 410 QS 05 12 Page 8...
Page 9: ...SCW 410 QS 05 12 Page 9 Figure 5 SCW Connections for R 410A...
Page 10: ...SCW 410 QS 05 12 Page 10 Figure 6 SCW Internal Flow Schematic...
Page 11: ...SCW 410 QS 05 12 Page 11 Figure 7 SCW Piping...
Page 15: ...SCW 410 QS 05 12 Page 15 Figure 10 SCW Electrical Ladder Diagram 230 1 60...
Page 16: ...SCW 410 QS 05 12 Page 16 Figure 11 SCW Electrical Schematic 230 1 60...
Page 17: ...SCW 410 QS 05 12 Page 17 Figure 12 SCW Series 230 3 60 Electrical Ladder Diagram...
Page 18: ...SCW 410 QS 05 12 Page 18 Figure 13 SCW Series 230 3 60 Electrical Schematic...
Page 19: ...SCW 410 QS 05 12 Page 19 Figure 14 Part 1 of 2 SCW Field Wiring Diagram Reference Figure 8...
Page 20: ...SCW 410 QS 05 12 Page 20 Figure 14 Part 2 of 2 SCW Field Wiring Diagram Reference Figure 9...
Page 28: ...SCW 410 QS 05 12 Page 28 Figure 21 Charging and Superheat Adjustment Process...