Cooling Assist Valve (CAV) Adjustment
After the system has been fully charged, the Cooling Assist Valve (CAV) is to be adjusted in
accordance with the following instructions or the process flow chart in Figure 30.
1. Before adjusting the CAV, attach a thermocouple lead with electrical tape, then
wrapped with ½” thick insulation, to the liquid refrigerant line between the compressor
unit and the air handler (or between the compressor unit and the hydronic heat
exchanger) as shown in Figure 27. Use an accurate temperature indicator.
2.
Run the air handler and compressor unit system in cooling mode
with return air
temperature maintained at 70°F. If necessary, warm the return air with the electric
strip heat in the air handler. For chilled water systems, water return temperature
should be maintained at 45
o
F to 50
o
F.
3. The CAV has been adjusted to full open position at the factory. This is the extreme
counterclockwise
position.
4. After an initial drop in suction temperature (when the system is first started in cooling
mode) the suction temperature will begin to rise, as will the liquid refrigerant level in
the ACC.
5. When suction temperature climbs to greater than 35°F, adjust the cooling assist valve
(CAV) slowly CLOCKWISE – 1/4 turn is typical. Do not allow the suction temperature
to drop below 35°F. Observe the refrigerant quality in the in-line sight glass
immediately upstream of the CAV, shown in Figure 27.
Figure 27. Refrigerant Flow During CAV Adjustment.
Summary of Contents for SC Series
Page 7: ...SC 410 QS 05 11 Page 7...
Page 8: ...SC 410 QS 05 11 Page 8 Figure 5 SC Connections for R 410A...
Page 9: ...SC 410 QS 05 11 Page 9 Figure 6 SC Internal Flow Schematic...
Page 10: ...SC 410 QS 05 11 Page 10 Figure 7 SC Piping...
Page 11: ...SC 410 QS 05 11 Page 11 Figure 8a SC Air Heating and Cooling...
Page 15: ...SC 410 QS 05 11 Page 15 Figure 11 SC Electrical Ladder Diagram 230 1 60...
Page 16: ...SC 410 QS 05 11 Page 16 Figure 12 SC Electrical Schematic 230 1 60...
Page 17: ...SC 410 QS 05 11 Page 17 Figure 13 SC Series 230 3 60 Electrical Ladder Diagram...
Page 18: ...SC 410 QS 05 11 Page 18 Figure 14 SC Series 230 3 60 Electrical Schematic...
Page 19: ...SC 410 QS 05 11 Page 19 Figure 15 SC Series 460 3 60 Electrical Ladder Diagram...
Page 20: ...SC 410 QS 05 11 Page 20 Figure 16 SC Series 460 3 60 Electrical Schematic...
Page 21: ...SC 410 QS 05 11 Page 21 Figure 17 SC Series 575 3 60 Electrical Ladder Diagram...
Page 22: ...SC 410 QS 05 11 Page 22 Figure 18 SC Series 575 3 60 Electrical Schematic...
Page 23: ...SC 410 QS 05 11 Page 23 Figure 19 Part 1 of 2 SC Field Wiring Diagram...
Page 24: ...SC 410 QS 05 11 Page 24 Figure 19 Part 2 of 2 SC Field Wiring Diagram...
Page 35: ...SC 410 QS 05 11 Page 35 Figure 30 CAV Adjustment Process Flow Chart...