HWM-H-IOM (10/14)
Page 6
B. Pre-Installation
Prior to installing the Hydronic Water Module and other EarthLinked
®
space heating and
cooling system above-ground components, you will need tools and equipment listed in
Section 8 to properly install the system.
Installation of the Hydronic Water Module must be done in accordance with this manual.
Prepare the Hydronic Water Module (HWM) for installation as follows:
1. Compare the data on the unit nameplate or packaging with ordering and shipping
information to verify the correct unit has been shipped (See Figure 1.)
2. Keep the HWM covered with the packaging until installation is begun and all plastering,
painting, etc. is finished.
3. Verify refrigerant tubing is free of kinks or dents.
4. Inspect all electrical connections. Connections must be clean and tight at the terminals.
IMPORTANT!
To avoid equipment damage, DO NOT use this equipment as a source of
heating or cooling during the construction process. The mechanical
components may become clogged with construction dirt and debris
which may cause system damage.