Mark  appropriate  cutting  lines  around  the  center 

point.  Cut  a  square  hole  in  the  ceiling.  Frame  a 

level, square opening centered over the hole that 

you have cut. Frame openings at each floor level 

above the fireplace. See 

FIG. 3

. These openings 

are to hold the Firestop and Attic Insulation Shield. 
Locate each opening by dropping a plumb bob to 
the four corners of the opening below. Maintain the 
2 inch airspace to combustibles.  See 

FIG. 4

.

TABLE 1

   FIG. 3

Frame Opening Dimensions

Flue Diameter

Framing Dimensions

12.5” ID

19.5” X 19.5”

Attach Chimney:

 Attach the first section of chimney 

on the Anchor Plate. The joint assembly is a male 

to female slip fit and held together with button lock 

tabs.  See 

FIG 2

.  Maintain a 2 inch clearance to 

combustibles. Do not fill the clearance space with 

any materials. If an offset is required, refer to Elbow 

Offset Installation Section.

CAP

STORM COLLAR

FLASHING

ATTIC INSULATION SHIELD

FIRESTOP

CHIMNEY

ANCHOR PLATE

FIREPLACE

FIRESTOP

CHIMNEY

CEILING/FLOOR

CEILING/FLOOR

CHIMNEY

ISOWOOL BLANKET

Frame Openings:

 From the ceiling, drop a plumb 

bob to the center of the fireplace’s flue outlet and 

mark  the  center  point  on  the  ceiling.  Refer  to 

TABLE 1

 for the framing dimensions.

FIG. 2

FEMALE END

MALE END

BUTTON LOCK

KNOCKOUT 
FOR LOCK

Summary of Contents for ECO-Steel

Page 1: ...th exception of the top portion of the chimney cap can be painted with a high temperature rust proof paint Wash the metal surface with a vinegar and water solution to remove any residue before painting Painting the chimney will help to increase chimney life Earthcore assumes no liability for structural damage or roof contamination as the result of creosote formation It is the owner s responsibilit...

Page 2: ...nd safety Do not over fire Any damage to the fireplace or chimney can possibly void the warranty Do not burn driftwood plastic or chemically treated wood such as railroad ties They are corrosive to your chimney system Follow the fireplace manufacturer s instructions regarding fuel ISOKERN FIREPLACE INSTALLATION Place Fireplace Position according to the fireplace manufacturer s installation instruc...

Page 3: ...9 5 AttachChimney Attachthefirstsectionofchimney on the Anchor Plate The joint assembly is a male to female slip fit and held together with button lock tabs See FIG 2 Maintain a 2 inch clearance to combustibles Do not fill the clearance space with any materials If an offset is required refer to Elbow Offset Installation Section CAP STORM COLLAR FLASHING ATTIC INSULATION SHIELD FIRESTOP CHIMNEY ANC...

Page 4: ... Supports which will support 30 feet of chimney FIG 5 Slide the Angle Support around the chimney and align over framed opening Secure to casing with 4 sheet metal screws and assemble brackets per FIG 6 Nail the brackets to the framing using a minimum of 2 nails or screws per bracket A Support Band may be required by some fireplace manufacturers to keep the chimney vertical and help maintain cleara...

Page 5: ...osure Always maintain a 2 air space clearance to combustibles Install the shield as follows Remove any insulation or debris from attic floor around the framed opening Assemble chimney sections above the Firestop to a height that extends beyond the height of the attic insulation shield Slip the Attic Insulation Shield over the chimney until the base sits squarely on the framed opening Secure the At...

Page 6: ...et chart add chimney sections between elbows total pipe length not to exceed 96 inches A Support Band or plumbers strap is required for every 4 foot interval between elbows to support the load as shown in FIG 12 Attach the upper elbow to bring the chimney back to vertical See TABLE 2 and FIG 13 for offset combinations FIG 13 FIG 12 TABLE 2 PLUMBER S STRAP SUPPORT BAND FIRESTOP W RADIATION SHIELD E...

Page 7: ...his transaction and shall not apply 2 The sole and exclusive remedy against Earthcore shall be for the repair or replacement of defective parts as provided herein above NO OTHER REMEDY Including but not limited to incidental or consequential loss shall be available The sole purpose of the stipulated exclusive remedy provided for herein shall be the repair and replacement of defective parts in the ...

Page 8: ...ECO36 36 Pipe 13ACECO48 13INECO48 48 Pipe 13ACECOAP 13INECOAP Anchor Plate 13ACECOAPD 13INECOAPD Anchor Plate w In Line Damper 13ACECOCC Chimney Cap 13ACECO15OS 13INECO15OS 15 Degree Elbow 13ACECO30OS 13INECO30OS 30 Degree Elbow 13ACECOWB Wall Band 2017 Earthcore Industries L L C Form No L2809 08 17 9670 13ACECOFS Firestop Assembly 13ACECOIS Insulation Shield 13ACECOFT Tall Cone Flashing 13ACECOFC...

Reviews: