Step 1
9
1.5
Wooden Deck
or
Concrete Ground
Base Assembly, cont’d
Base
Assembly on Wood
or Concrete Pad
Build a level wood
or concrete pad
that is slightly
wider and longer
than the green
house.
DO NOT
use Part 30 and 31
if set up on
wooden deck or
concrete ground.
1.3
1.4
30
31
27-1
Assembly on
Ground
Excavate the site
by removing the
top 3 in of grass or
soil and leveling
the base, allowing
a 6 in perimeter
around the
foundation.