5
3D
7K
7K
11.3
11.4
5
7K
1B/1C
1D/1E
5
3C
7K
7K
11.5
11.6
5
7K
1A
1A
7A
5
11.7
Attach (4) Horizontal Panel Supports 7K to Diagonal Roof Beam 1B, 1D and Roof Rafters 3D
using (5) Screw 5. Repeat on opposite side.
Attach (4) Horizontal Panel Supports 7K to Vertical Wall Supports 1A and 3C using
(5) Screw 5. Repeat on opposite side.
Attach (3) Horizontal Panel Supports 7A to
Vertical Wall Supports 1A, 3A , and 3B using
(4) Screw 5.
Installing the Panel Supports, cont’d
Step 11
38
Summary of Contents for GHPC48V2-GRN-AZ
Page 13: ...Step 2 11 2 1 2 4 19B E4 20B 18B 19B 13 2 3 2 1 2 2 2 3 2 2 5 Vent Window Assembly cont d ...
Page 22: ...Attach the Door cont d 14A 13A 2 1C 1B 5 3 5 4 5 2 5 1 5 5 5 3 Step 5 20 ...
Page 48: ...13 3 13 1 13 2 13 4 13 4 13 4 13 1 13 2 13 3 Installing the Accessories cont d Step 13 46 ...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......