background image

side of
hanger rail
with hole

figure 5.2

top horizontal support bar

ASSEMBLY INSTRUCTIONS

Cantilever Gown Rack

Eagle Foodservice Equipment, Eagle MHC, SpecFAB, and Retail Display are divisions of Eagle Group. ©2005 by the Eagle Group

• 100 Industrial Boulevard, Clayton, Delaware 19938-8903 U.S.A. • www.eaglegrp.com

• Phone: 302/653-3000 • (Foodservice) 800/441-8440 • (MHC/Retail) 800/637-5100

• Fax: 302/653-2065 or 302/653-3036

figure 5.1

Step 5 - Install hangers.

Step 6 - Plug holes.

Optional outer hanger rail cover

(Note: If removable hanger gown rack was ordered, fill hole

openings with #6 plugs.)

Step 3 - Attach top horizontal support bar to

vertical post assemblies.

(Mount support bar and dust covers as shown in

Step 2

.)

vertical post

assembly

#2 bolt

side of

hanger rail
with louver

hanger

hanger

rail

#5 nut

#4

screw

outer

hanger rail

cover

inner

hanger rail

#6

plug

(End)

Step 4 - Attach hanger rail.

hanger

rail

Reviews: