E
E
a
a
g
g
l
l
e
e
E
E
q
q
u
u
i
i
p
p
m
m
e
e
n
n
t
t
S
S
S
S
7
7
0
0
0
0
0
0
S
S
e
e
r
r
i
i
e
e
s
s
L
L
i
i
f
f
t
t
s
s
1-800-336-2776
SS7000-40
www.eagleequip.com
Adjusting the Cables
Plug the power unit into the appropriate electrical receptacle. Operate the power unit by holding
the upswitch (The power unit may take a minute or two to prime and evacuate all air). Take the
slack off of the cables. Check all pulley bolts and pulley collars to make sure they are tight.
Inspect the cables to ensure all are on track and on the pulleys.
Do not put your fingers between
the cable and the pulley!
Operate the lift to its highest position. Inspect the safety locks. All safety locks should be at
least 1” clear of highest safety stops. Safety locks require at least 1” clearance to disengage.
Tighten or loosen cables as necessary at each column top cap to ensure that tracks are even and
that all safety locks clear the safety stops simultaneously.
Upswitch
Release Valve