Install Column Top Caps
Locate the column top caps, then locate the necessary hardware -1/2” x 7” bolts (4 each) in the
bolt box, 1/2” x 1 1/4” bolts (4 each) in Bag A, 1/2” nuts (8 each) and 1/2 “ flat washers (16
each) in Bag C. Install the top caps in the columns - “R” caps go on “R” columns, “L” caps go
on “L” columns, cable slots face towards the center of the lift.
Secure the top caps with 1/2” x 1 1/4” bolts. Place the bolts with washers in through channel and
secure with washers and nuts on the outside of the column.
Install the 1/2” x 7” bolts through the column and top cap. Install from outside of the column,
and secure with a nut on the inside of the column. Tighten the 1 1/4” bolt to torque of 75 ft-lbs.
Tighten the 7” bolt to a torque of 50 ft-lbs. Do not over tighten the 7” bolt, as this may warp the
column channel and bind the guide blocks.