![EAE EE62C-35T-E Installation, Operation, And Parts Manual Download Page 17](http://html1.mh-extra.com/html/eae/ee62c-35t-e/ee62c-35t-e_installation-operation-and-parts-manual_3280227017.webp)
Installation, Operation and Parts Manual
EE62C-35T-E / EE62C-42T-E
17
Step 9: Connect steel cables.
1. Route and fix according to the following diagram of steel cable connection.
2. Use suitable means to raise carriages at both sides to the first latching point. Ensure the both carriages are locked.
3. After the cable being fixed, adjust and make the cables at both sides be with the same tightness. (This could be judged by the
sound caused by mechanical safety locking system during lifting process.)
4. Grease with NO.1 lithium grease (It is a must.)
Step 10: Install the hydraulic system.
Attention: Do not contaminate the hydraulic system when do the connection.
1. Mount the power unit onto the power side post.
1.Hex hut M10
2.Spring washer M10
3.Flat washer M10
4.Anti-shock pad
5.Hex head full swivel screw M10*35