Installation, Operation and Parts Manual
EE-MR30
15
Step 8: Install feet protection fenders.
4.4 Items to be checked before finishing installation.
S/N
Check items
YES
NO
1
Rising speed ≥20mm/s;
2
Noise with rated load ≤75dB(A);
3
Grounding resistance: not bigger than 4Ω;
4
Mechanical locks are robust and synchronized when running with rated load ;
5
If the control button works as “hold to run”?
6
If limit switches work well?
7
If grounding wire is connected?
8
If rise and lower smoothly?
9
If there is no abnormal noise during running with rated load?
10
If there is no oil leakage when running with rated load?
11
If all bolts, nuts or circlips is well secured?
12
If max lifting height is 1000mm?
14
If Safety advices, name plate and logos are clear?
Summary of Contents for EE-MR30
Page 10: ...Installation Operation and Parts Manual EE MR30 10 3 3 Dimensions...
Page 24: ...Installation Operation and Parts Manual EE MR30 24...
Page 25: ...Installation Operation and Parts Manual EE MR30 25...
Page 32: ...Installation Operation and Parts Manual EE MR30 32...
Page 34: ...Installation Operation and Parts Manual EE MR30 34...