4.1.5

 

Checking

 

parts

   

Unfold

 

the

 

package

 

and

 

check

 

if

 

any

 

parts

 

missed

 

as

 

per

 

the

 

following

 

list.

 

Do

 

not

 

hesitate

 

to

 

contact

 

us

 

in

 

case

 

any

 

parts

 

missed,

 

but

 

if

 

you

 

do

 

not

 

contact

 

us

 

and

 

insist

 

installing

 

upon

 

the

 

lack

 

of

 

some

 

parts,

 

we

 

as

 

well

 

as

 

our

 

dealers

 

will

 

not

 

bear

 

any

 

responsibility

 

for

 

this

 

and

 

will

 

charge

 

for

 

any

 

parts

 

subsequently

 

demanded

 

by

 

the

 

buyer.

   

S/N

 

Name

 

Specification

 

Qty

 

1

 

Lifting

 

platform

   

6605

 

2

 

2

 

Control

 

cabinet

 

/

 

1

 

3

 

Expansion

 

bolt

 

M18*160

 

16

 

4

 

Rubber

 

pad

   

38*120*160

 

4

 

5

 

Pneumatic

 

hose

   

8mm

 

2m

 

6

 

Installation

 

manual

 

 

1

 

7

 

Key

 

 

1

 

8

 

Oil

 

tank

 

label

 

 

1

 

4.2

 

Installation

 

attentions

   

4.2.1

 

Joints

 

of

 

oil

 

hose

 

and

 

wiring

 

must

 

be

 

firmly

 

connected

 

in

 

order

 

to

 

avoid

 

leakage

 

of

 

oil

 

hose

 

and

 

loose

 

of

 

electrical

 

wires.

 

4.2.2

 

All

 

bolts

 

should

 

be

 

firmly

 

screwed

 

up.

   

4.2.3

 

Do

 

not

 

place

 

any

 

vehicle

 

on

 

the

 

lift

 

in

 

the

 

case

 

of

 

trial

 

running.

 

4.3

 

General

 

installation

 

steps

   

Step

 

1:

 

Dismantle

 

the

 

package

 

of

 

the

 

lifting

 

platforms.

   

Remove

 

the

 

carton

 

and

 

packing

 

films

 

wrapped

 

on

 

the

 

platform.

   

Attention

 

1:

 

Take

 

off

 

oil

 

hose

 

protectors

 

when

 

cut

 

off

 

the

 

packing

 

strips.

   

Attention

 

2:

 

Avoid

 

scratching

 

the

 

painting

 

surface

 

and

 

hoses.

   

Step

 

2:

 

Use

 

proper

 

means

 

to

 

place

 

the

 

lifting

 

platform

 

at

 

expected

 

installation

 

site.

 

Raise

 

the

 

upper

 

platform

 

by

 

using

 

a

 

forklift

 

and

 

2

 

lifting

 

strings

 

until

 

the

 

mechanical

 

lock

 

is

 

engaged.

 

And

 

then

 

hoist

 

the

 

platform

 

to

 

the

 

expected

 

installation

 

site.

   

Attention1:

 

Before

 

hoisting,

 

make

 

sure

 

the

 

hoses

 

and

 

wires

 

are

 

well

 

protected

 

against

 

damage.

   

Attention1:

 

It

 

is

 

necessary

 

to

 

hold

 

the

 

platform

 

during

 

the

 

hoisting

 

process.

 

Irrelevant

 

person

 

is

 

not

 

allowed

 

in

 

installation

 

area.

   

Step

 

3:

 

Connect

 

hydraulic

 

oil

 

hoses.

   

Screw

 

torque

 

for

 

oil

 

hose

 

connector

 

is

 

60N*M.

 

Firstly,

 

connect

 

the

 

oil

 

hoses

 

between

 

the

 

two

 

platforms.

 

And

 

then,

 

connect

 

the

 

oil

 

hoses

 

from

 

the

 

main

 

platform

 

with

 

the

 

tie

ins

 

remained

 

on

 

the

 

hydraulic

 

block

 

in

 

the

 

control

 

cabinet.

 

Oil

 

hoses

 

go

 

into

 

the

 

cabinet

 

trough

 

the

 

holes

 

remained

 

at

 

the

 

bottom

 

of

 

the

 

cabinet.

   

Attention:

 

Connect

 

as

 

per

 

the

 

marks

 

on

 

the

 

hoses

 

and

 

do

 

not

 

contaminate

 

the

 

hydraulic

 

components

 

during

 

the

 

connection.

 

 

 

 

Summary of Contents for EE-6605B.PD

Page 1: ...issor lift heavy duty Electrical Leveling Lifting Capacity 5500KG Installation Operation and Parts Manual Please read this entire manual carefully and completely before installation or operation of th...

Page 2: ...and are protected against duplication and reproduction by copyright laws international agreements and other domestic legislation The reproduction or disclosure of instructions or an extract thereof is...

Page 3: ...descriptions 9 3 2 Construction of the lift 9 3 3 Dimensions 10 3 4 Technical data 10 INSTALLATION INSTRUCTIONS 11 4 1 Preparations before installation 11 4 2 Installation attentions 12 4 3 General in...

Page 4: ...r qualified persons 1 2 1 Scope of checking Regular checking essentially involves performing a visual inspection and a functional test This includes checking the condition of the components and equipm...

Page 5: ...fety locks are engaged before any attempt to work near or under the vehicle Never remove safety related components from the lift Do not use if safety related components are damaged or missing 1 3 11 D...

Page 6: ...clearly depicted on the lift to ensure that the operator is aware of and avoid the dangers of using the lift in an incorrect manner The labels must be kept clean and they have to be replaced if detac...

Page 7: ...rushing In the event of excessive vehicle weight incorrect mounting of the vehicle or on removing heavy object there is a risk of the vehicle falling off the lifting platform or tipping up Safety meas...

Page 8: ...e all appropriate precautions never stack to more than 2 meters in height never make stacks of single packs Always stack pairs of packs in a cross pattern so that the base is bigger and the resulting...

Page 9: ...rise accordingly The mechanical locking unit ensures no slipping in case of hydraulic failire Besides designs like 24V working voltage of control unit and limit switch low height alarming buzzer anti...

Page 10: ...Technical data Rated capacity 5000KG Full raised height 1750mm Full lowered height 240mm Full raised time with rated load about 55s Full lowered time with rated load about 55s Pneumatic working press...

Page 11: ...e at least 2 5mm2 wire core for 3Ph power and 4 0mm2 wire core for 1Ph power Construction of the foundation following consultation with the manufacturer s customer service or an authorized service age...

Page 12: ...of the lifting platforms Remove the carton and packing films wrapped on the platform Attention 1 Take off oil hose protectors when cut off the packing strips Attention 2 Avoid scratching the painting...

Page 13: ...running speed of the lift is mainly decided by the viscosity of the hydraulic oil we suggest using NO 46 hydraulic oil when average temperature of the location is above 18 degree Celsius and using NO...

Page 14: ...load 14 If expansion bolts nuts or circlips are well secured 15 If max lifting height is 1750mm 16 If safety advices name plate and logos are clear OPERATION INSTRUCTIONS 5 1 Precautions 5 1 1 Check a...

Page 15: ...WN I button Control the lowering movement SB3 DOWN II button Control the lowering movement for safety SB4 Safety lock button Engage the mechanical safety lock SB Emergency stop Cut operation power in...

Page 16: ...he operation manual before operation 2 Drive and park the vehicle midway between two platforms 3 Turn the selection switch on the control panel to Main lift and push the UP button to rasie the lifting...

Page 17: ...3 Turn the selection switch to PD 4 Using either the inspection torch or the key fob Pressing and holding the left button will operate the nearside PD plate rotation of steering from extent to extent...

Page 18: ...se or jammed Clean or adjust it The gear pump is damaged Replace it Oil level is too low Add oil The oil hose became loose or dropped off Tighten it The cushion valve became loose or jammed Clean or a...

Page 19: ...and disengage simultaneously by pushing control buttons Every day 8 Lifting platform Check the synchronization of both lifting platforms Ensure both platforms ascend and descend synchronously Every d...

Page 20: ...l always keep a good working condition and its service life could be extended Annex 1 Floor plan C20 25 concrete base with strength more than 3000psi tolerance of flatness less than 5mm and minimum th...

Page 21: ...Installation Operation and Parts Manual EE 6605B PD 21 Floor plan for surface installation...

Page 22: ...Installation Operation and Parts Manual EE 6605B PD 22 Annex 2 Electrical shcemes and parts list...

Page 23: ...Installation Operation and Parts Manual EE 6605B PD 23...

Page 24: ...Installation Operation and Parts Manual EE 6605B PD 24...

Page 25: ...402010 Emergency stop NBP2 BS542 40 1 320503002 Ground terminals 4 1 320505011 Retaining chip LT 2 5 2 QF 320801001 Circuit breaker DZ47 63C16 3P 1 QF1 320803003 Circuit breaker DZ47 63C3 1P 1 QF2 320...

Page 26: ...ydraulic shcemes and parts list 1 oil tank 11 flow control valve 2 oil sucking filter 12 tank cover 3 gear pump 13 leveling valve 4 coupling 14 cylinder hydraulic block 5 motor 15 solenoid valve 6 hyd...

Page 27: ...7 615031003 PD Oil cylinder GEG PD A1 B6 4 8 615026006 Secondary oil cylinder 6605B A4 B2 1 9 624001095 Secondary oil cylinder L 2000mm 1 10 410260630 Hydraulic block 6605B A3 B5 55 40 38 2 11 410260...

Page 28: ...201103001 Hex flange screw M5 25 4 4 202109064 Hex socket cylinder head screw M6 30 4 5 207103019 Composite washer M14 6 6 310101028 Shifting connector G1 4 M14x1 5 4 7 320204016 Aluminum motor 380V...

Page 29: ...C 1 21 330404001 Coupling YL A 1 Seal rings POS Code Name Specfication Qty Remark 1 207103009 Composite piston seal ring KGD120 95 22 4 6 35 1 Main cylinder 2 207102013 Y seal ring SD48 58 7 1 Main cy...

Page 30: ...4 M12 1 6 310401001 Pneumatic directional valve 3V210 08DC24V 1 7 310103006 Three way pneumatic connector KLE 8 1 8 310501005 Pneumatic cylinder CQ2B32 30 2 9 310201003 Silencer SLM01 R1 8 M8 2 Annex...

Page 31: ...8 20 202109053 Hex socket post head bolt M12X35 20 21 204104001 Washer 8X 40X2 5 4 22 202110004 Hex head full swivel bolt M8X12 4 23 201102011 Outside hex bolt M8X15 14 24 204101005 Washer 8 12 25 614...

Page 32: ...29 Cross round headed bolt M6X12 10 56 612026006 Shaft of bracket A 6605 A12 4 57 410260151B Block of padding plate 6605 A6 B1 C3 2 58 614026013 Bracket B welding 6605 A6 B2 C1 2 59 420260030B Base pl...

Page 33: ...8 84 410260033 Plate D of limit switch 6605 A7 B5 1 85 410260023 Plate C of limit switch 6605 A7 B4 1 86 202101002 Cross round headed bolt M3X15 4 87 320302002 Limit switch PL 05N 2 88 614026022 Conne...

Page 34: ...15_GB818 2 13 202111007 Hex socket flat head screw M8X20_GB70_3 8 14 203103006 Hex thin nut M8_GB6172 8 15 614031222 PD side baffle plate GEG PD A1 B7 1 16 410210011 Right angle connector 6603B A9 B4...

Page 35: ...EG PD A1 B6 2 11 614031222 PD side baffle plate GEG PD A1 B7 1 12 410310361 Holder of limit switch GEG PD A1 B8 1 13 540103072 PD name plate GEG PD A1 B9 1 14 410310191 PD cylinder sheath GEG PD A1 B1...

Reviews: