
Installation, Operation and Parts Manual
EE-6501
17
Step 5: Connect the electrical system.
Requirements for power supply cable of the installation site: at least 2.5mm
2
wire core for 3Ph power and 4.0mm
2
wire core for 1Ph
power.
Refer to Annex 1 when fix the electrical system.
Connect the wire connectors for rising and lowering limit switches.
Connect the power suppler cable to external electricity supply.
(For three phase power supply ,if the lift doesn't raise and the motor may turn in the wrong direction, in such event, interchange wires U, V
in the control cabinet) .
Step 6: Connect the pneumatic release system.
Screw torque for connector is 20Nm.
Connect air hoses as per the following fig.
External compressed air shall be prepared by the end user before installation.
Attention: Do not contaminate the pneumatic components during the connection.
Summary of Contents for EE-6501
Page 10: ...Installation Operation and Parts Manual EE 6501 10 3 3 Dimensions...
Page 14: ...Installation Operation and Parts Manual EE 6501 14 Recessed mounting...
Page 27: ...Installation Operation and Parts Manual EE 6501 27 Annex 1 Wiring diagrams and parts list...
Page 28: ...Installation Operation and Parts Manual EE 6501 28...
Page 37: ...Installation Operation and Parts Manual EE 6501 37...