background image

warning signals

2S

D1x

EUROPEAN SAFETY SYSTEMS LTD

IMPRESS HOUSE

MANSELL ROAD

ACTON

LONDON W3 7QH

WWW.E2S.COM

C

THIS DRAWING AND ANY INFORMATION OR DESCRIPTIVE 

MATTER THEREIN IS COMMUNICATED IN CONFIDENCE AND 

IS THE COPYRIGHT PROPERTY OF EUROPEAN SAFETY 

SYSTEMS LTD. NEITHER THE WHOLE OR ANY EXTRACT MAY 

BE DISCLOSED, LOANED, COPIED OR USED FOR 

MANUFACTURING OR TENDERING PURPOSES WITHOUT THEIR 

WRITTEN CONSENT.

EUROPEAN SAFETY SYSTEMS LTD.

AS PER LATEST DATE OF ISSUE SHOWN ABOVE

DRAWING TO BS8888:2000
GEOMETRIC TOLERANCES TO ISO1101:1983
LINEAR DIMENSIONAL TOLS

ANGULAR DIMENSIONAL TOLS

STANDARDS

MOD No.

REASON - INITIAL - DATE

ISSUE

DATE

APPROVED

CHECKED

DATE

DATE

DRAWN

WEIGHT (Kg)

SURFACE FINISH

MATERIAL

ALTERNATIVE MATERIAL

SHEET

SCALE

TITLE

A3

IF IN DOUBT, ASK - 
DO NOT SCALE

ALL DIMENSIONS IN MM

DRAWING NUMBER

A

B

C

D

E

F

G

10

9

G

F

E

7

8

6

5

D

C

1

3

4

2

A

B

D190-06-005

R.S.RAIT

B.ISARD

R.N.POTTS

OF

NTS 1

SWITCHES FOR STAGE OPERATION
CUSTOMER SUPPLIED

1

Earth

Earth

Stage 2
Stage 3

Common

Live IN

Live OUT

Neutral IN

Neutral OUT

Earth

Stage 1
Stage 2

Common

N

N

L

L

E

N

N

L

L

E

C

N

N

L

L

E

C

S2

S3

Live IN

Live OUT

Neutral IN

Neutral OUT

Stage 1 Live IN

Stage 1 Live OUT

Stage 1 Neutral IN

Stage 1 Neutral OUT

Single Stage Configuration

                         Config.: 1a

Stage 1: Apply Power to Stage 1 Live & Stage 1 Neutral

Two Stage Voltage Free Activation Configuration         Config.: 2

Power: Live & Neutral
Stage 1: Connect  Stage 1 to Common
Stage 2: Connect  Stage 2 to Common
Stage 3: Connect both Stage 1 & Stage 2 to Common

Three/Four Stage Configuration

    Config.: 1b

Stage 1: Apply Power to Live & Neutral
Stage 2: Apply Power to Live & Neutral

& connect Stage 2 to Common

Stage 3: Apply Power to Live & Neutral

& connect Stage 3 to Common

Stage 4: Apply Power to Live & Neutral

& connect both Stage 2 & Stage 3 to Common

CUSTOM 

CONFIGURATION

CONTACT E2S 

WHEN ORDERING

INTRODUCTION

1

RSR - 19/01/2022

19/01/2022

19/01/2022

19/01/2022

D1xS1 / D1xS2 / GNExS1 / GNExS2 / STExS1 / 
STExS2 AC SOUNDER WIRING DIAGRAMS

Summary of Contents for GNExS1F Series

Page 1: ...50 60Hz 73mA 80mA 110 105 230Vac 48mA GNExS1FDC024 12Vdc 10 30Vdc 221mA 221mA 115 110 24Vdc 185mA GNExS1FDC048 48Vdc 38 60Vdc 115mA 221mA 115 110 GNExS1FAC230 115Vac 100 260Vac 50 60Hz 73mA 80mA 115...

Page 2: ...lassification The units can be installed in locations with the following conditions Area Classification Zone 1 Explosive gas air mixture likely to occur in normal operation Zone 2 Explosive gas air mi...

Page 3: ...ble between the cover and base of the sounder enclosure Tighten the M3 grub screw 7 Installation Requirements 7 1 Installation Standards Compliance Warning High voltage may be present risk of electric...

Page 4: ...ed in the table below Max Ambient Temperature C Model 40 45 50 55 60 65 70 GNExS1 70 75 80 85 90 95 Table 2 Min Ratings of Cables Cable Glands Cable Glands Appropriate cable glands to be customer supp...

Page 5: ...t tones that can be selected independently for the first and second stage alarms The tones are selected by operation of the tone setting DIP switch 1 DIP 2witch 2 see figures 6 and 7 on the PCB for st...

Page 6: ...06 005 for AC schematic diagrams 7a AC Single Stage Configuration Default 7b AC Three Four Stage Configuration Default 8 AC Two Stage Voltage Free Activation Configuration Custom K Table 3 Summary of...

Page 7: ...ant standards EN60079 19 IEC60079 19 Explosive atmospheres Equipment repair overhaul and reclamation EN 60079 17 IEC60079 17 Explosive atmospheres Electrical installations inspection and maintenance F...

Page 8: ...NE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120 MIN 2W MIN OR 1K MIN 0 5W MIN 28V MAX SYSTEM 470 MIN 2W MIN OR 2 4K MIN 0 5W MIN RECOMMENDED MINIMUM VALUES R1 Stage 1 ve IN Stage 1 ve OUT...

Page 9: ...ve OUT Stage 1 ve OUT Stage 3 ve Stage 1 ve IN H2 H1 Stage 1 ve Stage 1 ve Stage 2 ve Stage 2 ve OF 2 3 R1 S2 S3 R1 S2 R2 OPTIONAL LINE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120 MIN 2W...

Page 10: ...ge 2 ve Stage 2 ve Two Three Stage Voltage Free Activation Configuration Config 5 Customer Set H1 H2 to Negative Switching See Below Power ve ve Stage 1 Connect Stage 1 ve to Common ve Stage 2 Cconnec...

Page 11: ...RAIT B ISARD R N POTTS OF NTS 1 SWITCHES FOR STAGE OPERATION CUSTOMER SUPPLIED 1 Earth Earth Stage 2 Stage 3 Common Live IN Live OUT Neutral IN Neutral OUT Earth Stage 1 Stage 2 Common N N L L E N N...

Page 12: ...0 0 0 1 0 1 0 0 0 0 1 1 0 0 0 1 1 1 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 0 1 0 1 0 0 1 1 0 1 0 0 0 0 1 1 0 0 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 1 0 0 1 0 1 1 0 0 1 0 0 0 1 0 1 0 1...

Page 13: ...y No 2813 CSA Group Netherlands B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIB or IIC T...

Page 14: ...te and Place of Issue London 23 12 2020 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the...

Reviews: