background image

warning signals

2S

D1x

EUROPEAN SAFETY SYSTEMS LTD

IMPRESS HOUSE

MANSELL ROAD

ACTON

LONDON W3 7QH

WWW.E2S.COM

C

THIS DRAWING AND ANY INFORMATION OR DESCRIPTIVE 

MATTER THEREIN IS COMMUNICATED IN CONFIDENCE AND 

IS THE COPYRIGHT PROPERTY OF EUROPEAN SAFETY 

SYSTEMS LTD. NEITHER THE WHOLE OR ANY EXTRACT MAY 

BE DISCLOSED, LOANED, COPIED OR USED FOR 

MANUFACTURING OR TENDERING PURPOSES WITHOUT THEIR 

WRITTEN CONSENT.

EUROPEAN SAFETY SYSTEMS LTD.

AS PER LATEST DATE OF ISSUE SHOWN ABOVE

DRAWING TO BS8888:2000

GEOMETRIC TOLERANCES TO ISO1101:1983

LINEAR DIMENSIONAL TOLS

ANGULAR DIMENSIONAL TOLS

STANDARDS

MOD No.

REASON - INITIAL - DATE

ISSUE

DATE

APPROVED

CHECKED

DATE

DATE

DRAWN

WEIGHT (Kg)

SURFACE FINISH

MATERIAL

ALTERNATIVE MATERIAL

SHEET

SCALE

TITLE

A3

IF IN DOUBT, ASK - 

DO NOT SCALE

ALL DIMENSIONS IN MM

DRAWING NUMBER

A

B

C

D

E

F

G

10

9

G

F

E

7

8

6

5

D

C

1

3

4

2

A

B

D190-06-001

R.S.RAIT

B.ISARD

R.N.POTTS

OF

NTS

1

3

OPTIONAL LINE MONITORING RESISTOR, CUSTOMER SUPPLIED,  

14V MAX SYSTEM = 120Ω MIN, 2W MIN OR 1KΩ MIN, 0.5W MIN

28V MAX SYSTEM = 470Ω MIN, 2W MIN OR 2.4KΩ MIN, 0.5W MIN

RECOMMENDED MINIMUM VALUES:

R1

Stage 1 +ve IN

Stage 1 +ve OUT

Common -ve IN

Common -ve OUT

Stage 2 +ve

Stage 1 +ve IN

Stage 1 +ve OUT

Common -ve IN

Common -ve OUT

Stage 2 +ve

Stage 3 +ve

R1

+

-

-

+

R1

+

-

-

+

S2

R1

+

-

-

+

S2

S3

Stage 1 +ve IN

Stage 1 +ve OUT

Stage 1 -ve IN

Stage 1 -ve OUT

Single Stage 

Configuration

Config.: 1a

Line Monitoring

Set to positive switching (default)

Stage 1: Apply Power to Stage 1 +ve & Stage 1 -ve

Two Stage 

Configuration

             Config.: 1b

Common Negative

Set to positive switching (default)

Stage 1: Apply Power to Stage 1 +ve & Common -ve 

Stage 2: Apply Power to Stage 2 +ve & Common -ve

Three/Four Stage 

Configuration

      Config.: 1c

Common Negative

Set to positive switching (default)

Stage 1: Apply Power to Stage 1 +ve & Common -ve

Stage 2: Apply Power to Stage 2 +ve &Common -ve 

Stage 3: Apply Power to Stage 3 +ve &Common -ve

Stage 4: Apply Power to Stage 2 +ve, Stage 3 +ve & Common -ve

19/01/2022

19/01/2022

19/01/2022

D1xS1 / D1xS2 / GNExS1 / GNExS2 / STExS1 / 

STExS2 DC SOUNDER WIRING DIAGRAMS

INTRODUCTIONINTRODUCTION

1

RSR - 19/01/2022

Summary of Contents for D1xS1 Series

Page 1: ...EEP TIGHTLY CLOSED WHEN IN OPERATION WARNING FIT SEALING FITTING IN CONDUIT RUNS WITHIN 18 INCHES FROM ENCLOSURE EQUIPMENT MUST NOT BE INSTALLED WITH THE HORN FACING UPWARDS OF HORIZONTAL DO NOT OPEN...

Page 2: ...o 75 C Ex db IIC T6 Gb Ta 55 C to 70 C Ex tb IIIC T82 C Db Ta 55 C to 75 C See Product table for electrical ratings of each unit model Certificate No DEMKO 19ATEX2141X IECEx ULD 19 0008X UKEx UL UL21U...

Page 3: ...ected to external conditions that might cause a build up of electrostatic charges on non conducting surfaces Only the explosionproof cover is to be used for access to the enclosure for installation se...

Page 4: ...and the length of the cable runs The cable size selected must have the necessary capacity to provide the input current to all the sounders connected to the line AC 1 0 2 5mm2 AWG18 AWG12 DC 0 2 2 5mm...

Page 5: ...n Sounders See schematic diagram D190 06 001 for details 9 1 Configuration See Table 1 for product power supply and Sound Pressure Levels SPL Configuration for DC Units Fig 5 DC PCBA Configuration for...

Page 6: ...iring options Config Voltage Configuration Description Features Product Option Identifier 1a DC Single Stage Configuration Line monitoring Positive Switching 1 1b DC Two Stage Configuration Common Neg...

Page 7: ...f Line Monitoring An optional 12 way terminal module is available to enable up to four alarm stages to be activated from three DC voltage output channels The three alarm stage activation inputs can be...

Page 8: ...Only End of Line Devices may be fitted between the ve ve terminals of the PCBA Please ensure that the device legs meet the wire size range stated for the connection terminals and are fitted correctly...

Page 9: ...0 0 0 1 0 1 0 0 0 0 1 1 0 0 0 1 1 1 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 0 1 0 1 0 0 1 1 0 1 0 0 0 0 1 1 0 0 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 1 0 0 1 0 1 1 0 0 1 0 0 0 1 0 1 0 1...

Page 10: ...US 100 2dB A CA 108 5dB A P3 US 103 5dB A CA 111 6dB A at 10 feet 24Vdc For Fire Alarm applications the Sounder Volume must be at the highest setting see volume control section For fire alarm use Ton...

Page 11: ...al Axis 3dB A 39 41 38 41 6dB A 45 47 64 69 D1xS2FDC024 A D1xS2FDC024 S Sounder Directional Characteristics for Canadian Fire CAN ULC S525 P3 OSPL Horizontal Axis Vertical Axis 3dB A 46 48 46 47 6dB A...

Page 12: ...INE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120 MIN 2W MIN OR 1K MIN 0 5W MIN 28V MAX SYSTEM 470 MIN 2W MIN OR 2 4K MIN 0 5W MIN RECOMMENDED MINIMUM VALUES R1 Stage 1 ve IN Stage 1 ve OUT...

Page 13: ...n ve OUT Stage 1 ve OUT Stage 3 ve Stage 1 ve IN H2 H1 Stage 1 ve Stage 1 ve Stage 2 ve Stage 2 ve OF 2 3 R1 S2 S3 R1 S2 R2 OPTIONAL LINE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120 MIN 2...

Page 14: ...er to Stage 2 ve Stage 2 ve Two Three Stage Voltage Free Activation Configuration Config 5 Customer Set H1 H2 to Negative Switching See Below Power ve ve Stage 1 Connect Stage 1 ve to Common ve Stage...

Page 15: ...5 R S RAIT B ISARD R N POTTS OF NTS 1 SWITCHES FOR STAGE OPERATION CUSTOMER SUPPLIED 1 Earth Earth Stage 2 Stage 3 Common Live IN Live OUT Neutral IN Neutral OUT Earth Stage 1 Stage 2 Common N N L L E...

Page 16: ...warden Industrial Park Hawarden Deeside CH5 3US UK Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIC T6 T3 GB II 2D Ex tb IIIC T82 C 145 C...

Page 17: ...e and Place of Issue London 10 02 2022 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the m...

Page 18: ...CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 2G Ex db IIC T6 T3 GB II 2D Ex tb IIIC T82 C 145 C Db Standards applied EN 60079 0 2018 EN...

Page 19: ...ate and Place of Issue London 24 02 2022 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the...

Page 20: ...Page left Intentionally blank...

Reviews: