
ENGINE REASSEMBLY
Page E-11
Engine Shop Rebuild and Parts Manual
Fig. E-6 Timing Belt Covers, Drive and Cam Pulleys, Idler and Timing Belt con’t
Idler
Idler clamp bolt
tighten to 10 - 13
ft lbs torque
Idler spring
Spring stop
Align key way with mark
Align notch and mark
1/8" - 1/4"
Deflection
at 10 lbs
"push"
A
Summary of Contents for 295cc
Page 7: ...Page vi TABLE OF CONTENTS Engine Shop Rebuild and Parts Manual Notes ...
Page 9: ...viii HOW TO USE THIS MANUAL Engine Shop Rebuild and Parts Manual ...
Page 11: ...ENGINE DISASSEMBLY Page A ii Repair and Service Manual Notes ...
Page 19: ...ENGINE DISASSEMBLY Page B ii Repair and Service Manual Notes ...
Page 29: ...ENGINE DISASSEMBLY Page B 10 Engine Shop Rebuild and Parts Manual Notes ...
Page 31: ...ENGINE MEASUREMENTS Page C ii Engine Shop Rebuild and Parts Manual Notes ...
Page 45: ...ENGINE MEASUREMENTS Page C 14 Engine Shop Rebuild and Parts Manual Notes ...
Page 47: ...ENGINE REASSEMBLY Page D ii Engine Shop Rebuild and Parts Manual Notes ...
Page 63: ...ENGINE REASSEMBLY Page D 16 Engine Shop Rebuild and Parts Manual Notes ...
Page 65: ...ENGINE REASSEMBLY Page E ii Engine Shop Rebuild and Parts Manual Notes ...
Page 95: ...LIMITED WARRANTY Page G ii Engine Shop Rebuild and Parts Manual Notes ...