8
Control Test
Although each Blade CP model is test flown at the factory, it is a good idea to test the controls prior to the
first flight to ensure none of the servos, linkages or parts were damaged during shipping and handling. Before
proceeding, unplug both the main and tail motor wires from the 4-in-1 control unit making note of their direction
and polarities for proper re-installation after the control test is complete. It is not safe to perform the control test
with the main or tail motor plugged into the 4-in-1 control unit after power up.
Summary of Contents for Blade CP
Page 26: ...26 Notes...