INSTALLATION
SECTION 2 INSTALLATION
2.1 INTRODUCTION
Information in this section tells how to set up the
repeater for operation in an LTR system. It is assumed
that the repeater has been previously aligned at the
factory or as described in the alignment procedure in
Section 7.
Even though each repeater is thoroughly aligned
and tested at the factory, it is good practice to check
performance before it is placed in service. This
ensures that no damage occurred during shipment and
that the repeater is otherwise operating properly. Per-
formance testing is described in Sections 7.1, 7.2, 7.3
and 7.4.
2.1.1 SITE PREPARATION AND ANTENNA IN-
STALLATION
Site preparation and antenna installation are not
within the scope of this manual. Basic installation
requirements are discussed in the "Dealer Guide To
Site Preparation", Part No. 004-8000-100. Factory
installation is also available. Contact your Johnson
representative for more information.
2.2 ENVIRONMENT
The following conditions should be considered
when selecting a site for the Repeater.
Operating Temperature.
-30
°
C to +60
°
C (-22
°
F to +140
°
F).
Humidity.
Less than 95% non-condensing relative humidity
at 50
°
C.
Air Quality.
For equipment operating in a controlled environ-
ment with the Repeaters rack mounted, the airborne
particles must not exceed 30
µ
g/m
3
.
For equipment operating in an uncontrolled envi-
ronment with the Repeaters rack mounted, the air-
borne particles must not exceed 100
µ
g/m
3
.
NOTE: If the Repeater is installed in an area that
exceeds these environmental conditions, the site
should be equipped with air filters to remove dust and
dirt that could cause the equipment to overheat.
When the repeaters are installed in an environ-
ment that contains small airborne particles, e.g. grain
dust or salt fog, the repeater cabinets need to be
sealed. A heat exchanger, i.e. air conditioner, is then
required to cool the cabinets. The air conditioners
must be suited for the environment. Each repeater
(110W) requires >2400 BTU/hr dissipation to main-
tain exterior cabinet temperature.
2.3 VENTILATION
The RF modules and the power supply are
equipped with fans, controlled by thermostats, that
force air through the equipment for cooling. The air
flow is from the front to the back of the equipment.
This permits the Repeaters to be stacked or rack
mounted (see Figure 2-4). There are a few consider-
ations when installing Repeaters to provide adequate
air circulation.
1. The Repeaters should be mounted with a minimum
of 6 inches clearance between the front or back of
the cabinet for air flow. The power supply requires
a minimum of 18 inches at the back of the Repeater
for removal.
NOTE: Repeaters should not touch. Leave a mini-
mum of one empty screw hole (approximately 1/2")
between repeaters vertically especially for bottom
ventilation slots in high power repeaters.
2. Cabinet enclosures must provide air vents for ade-
quate air circulation.
3. Temperature and humidity must be considered
when several Repeaters are installed at a site. This
might require air conditioning the site.
Summary of Contents for 242-20X1-213
Page 2: ...1 2 October 1995 Part No 001 2008 202 ...
Page 14: ...TABLE OF CONTENTS CONT 10 ...
Page 24: ...INTRODUCTION AND OPERATION 1 10 August 2000 Part No 001 2001 200 ...
Page 94: ...CIRCUIT DESCRIPTION 6 44 August 2000 Part No 001 2001 200 ...
Page 118: ...ALIGNMENT AND TEST PROCEDURES 7 20 August 2000 Part No 001 2001 200 ...
Page 126: ...SERVICING 8 8 August 2000 Part No 001 2001 200 ...
Page 160: ...PARTS LIST 9 34 August 2000 Part No 001 2001 200 ...
Page 197: ......
Page 198: ...Part Number 001 2001 200 8 00mwp Printed in U S A ...