INSTALLATION INSTRUCTIONS
E-BBD Series
www.e-conolight.com | 888.243.9445 | FAX: 262.504.5409
CAUTIONS
IMPORTANT SAFEGUARDS
When using electrical equipment, basic safety
precautions should always be followed including the
following:
READ AND FOLLOW ALL
SAFETY INSTRUCTIONS
1. DANGER
- Risk of shock- Disconnect power before
installation.
DANGER
– Risque de choc – Couper l’alimentation
avant l’installation.
2. This luminaire must be installed in accordance with the
NEC or your local electrical code. If you are not familiar
with these codes and requirements, consult a qualified
electrician.
Ce produit doit être installé conformément à NEC ou votre
code électrique local. Si vous n’êtes pas familier avec ces
codes et ces exigences, veuillez contacter un électricien
qualifié.
3. Min. 90
°
C supply conductors.
Les fils d’alimentation 90
°
C min
4. Suitable for mounting within 1.2 M (4 ft) of the ground.
Peut être installé à moins de 1,2 m (4 pi) du sol.
5. Suitable for operation in ambient not exceeding 40°C.
Peut etre utilise a une temperature ambiante n’excedant
pas 40°C.
6. Suitable for Wet Locations.
Adspte pour les Endroits Mouiles.
SAVE THESE INSTRUCTIONS
FOR FUTURE REFERENCE
NOTES
1. This carton contains fixture, anchor bolts and mount-
ing template. See last page for not-to-scale mounting
template.
FOUNDATION
NOTE:
Anchor bolts, template, and Wire-Tie Bracket are
attached to base plate for shipping.
1. Foundation should be a minimum of 12 inches (305 mm) in
diameter, finished level and smooth, with a depth below grade of 24
(610 mm) inches.
NOTE:
in areas where frost is imminent, consult
with a civil engineer for a recommended foundation detail.
2. Provided are three 3/8" diameter x 12" (254 mm) long anchor bolts
and mounting template (included). Remove base plate from end of
bollard by loosening (DO NOT remove) the 4 set screws at the base
of the bollard with a 1/8” Allen wrench. Template and anchor bolts
can be removed from base to allow for installation of anchor bolts.
3. Use template to set anchor bolts at proper location (Note conduit
entry allowance). Anchor bolts should project 3" (76 mm) above
concrete.
NOTE: Fixture head does not need to be removed from bollard
pole during installation.
1. To allow for base plate leveling, before positioning base plate on
anchor bolts, thread one leveling nut followed by a washer onto each
anchor bolt. See
Figure 1.
2. Place base plate over anchor bolts and leveling nuts.
3. Position Wire-Tie Bracket on one of the anchor bolts.
4. Loosely tighten (3) sets of locking washers and nuts onto ends of
anchor bolts, making sure washer and nut of one of the anchor bolts
retains Wire-Tie Bracket.
5. Level the base plate by adjusting the leveling nuts under the base
plate. Once leveled, tighten the upper nuts on top of the base plate.
6. Place conduit supply wires through the wire-tie in the Wire-Tie
Bracket.
7. Make wiring connections per the Electrical Connections section.
8. Tighten wire-tie on Wire-Tie Bracket to ensure wiring connections are
supported above ground level. See
Figure 2.
9. Place bollard tube over base plate.
10. Progressively hand tighten 4 set screws at the base of the bollard
tube with 1/8" Allen wrench. Once all 4 screws are hand tight, finish
tightening screws. See
Figure 3.
1. Loosen (DO NOT Remove) the 4 set screws under the fixture head
using 1/8" Allen wrench. See
Figure 4.
2. Rotate the head to reposition 180
°
shield.
3. Progressively retighten all 4 set screws until they are hand tight.
Finish tightening screws.
BOLLARD INSTALLATION
ADJUSTMENT OF SHIELDING FOR
180° MODEL
Concrete
Foundation
(3) Anchor J-Bolts
Wiring Conduit
(By Others)
(3) Sets of Leveling
Washers & Nuts
3”
6”
Base Plate
(3) Sets of Locking
Washers & Nuts
Wire-Tie
Bracket
FIGURE 1