Page 1: ...POWERCUBE User Manual POWERCUBE User Manual ...

Page 2: ...4 2 CURRENT PROTECTION 11 2 4 3 TEMPERATURE PROTECTION 11 2 4 4 OTHER PROTECTION 11 3 INSTALLATION AND CONFIGURATION 12 3 1 READY FOR INSTALLATION 12 3 1 1 ENVIRONMENTAL REQUIREMENTS 12 3 1 2 TOOLS AND DATA 12 3 1 3 TECHNICAL PREPARATION 13 3 1 4 UNPACKING INSPECTION 13 3 1 5 ENGINEERING COORDINATION 15 3 2 EQUIPMENT INSTALLATION 15 3 2 1 INSTALLATION PREPARATION 16 3 2 2 MECHANICAL INSTALLATION 1...

Page 3: ...equirements of environmental protection and personal safety The storage use and disposal of the products shall be carried out in accordance with the product manual relevant contract or relevant laws and regulations Customer can check the related information on the website of Jiangsu Daqin New Energy Technology Co Ltd when the product or technology is updated Web URL http www dyness tech com Please...

Page 4: ...us if case bulging or another abnormal phenomenon For your safety device shall be ground connected properly before normal use To assure the proper use please make sure parameters among the relevant device are compatible Please do not mixed use batteries from different manufacturers different types and models as well as old and new together Ambient and storage method could impact the life span and ...

Page 5: ...in parallel to provide users with energy storage power generation During the day the excess power of photovoltaic power generation can be stored in the battery At night or when needed the stored electrical energy can be used to supply power to the electrical equipment which can improve the efficiency of photovoltaic power generation peak load shifting and emergency power backup This user manual de...

Page 6: ... materials are lithium iron phosphate LiFePO4 safer with longer life span Carries battery management system with better performance possesses protection function like over discharge over charge over current abnormal temperature Self management on charging and discharging Single core balancing function Intelligent design configures integrated inspection module with 3 remote functions remote measuri...

Page 7: ...ual before using The scrapped battery cannot be put into the garbage can and must be professionally recycled After the battery life is terminated the battery can continue to be used after it recycled by the professional recycling organization and do not discard it at will This battery product meets European directive requirements This battery product passed the TUV certification test ...

Page 8: ... 7 2 9 0 10 8 Max Power kW 7 2 10 8 10 8 10 8 10 8 Maximum charge discharging current Ad c 150 225 225 225 225 1s Peak Power kW 7 2 10 8 14 4 18 21 6 1s Peak Current A 150 225 300 375 450 Charging Current A 75 112 5 150 187 5 225 Discharge Current A 75 112 5 150 187 5 225 Operating altitude range m 2000m 2000m 2000m 2000m 2000m Storage temperature range C 10 40 10 40 10 40 10 40 10 40 Storage humi...

Page 9: ...nterface 2 Power cable negative waterproof connector The battery DC output negative pole Interface 3 RJ45 network cable connector Reserve Interface 4 RJ45 network cable connector CAN RS485 communication interface Factory default CAN communication mode Interface 5 Power cable positive waterproof connector The battery DC output positive pole Interface 6 Power cable positive waterproof connector Rese...

Page 10: ...m firstly swich off the DC breaker between the battery with the inverter then press SW for 3s and switch the power button to OFF 5 SOC Green light showing battery capacity 6 ALM Red lights flash when warming always on when Protection When the condition of triggering protection is removed the battery can recover automatically 7 RUN Green light flashing when standby always on when discharge flash wh...

Page 11: ...he battery ID and authorizes the opening operation Only authorized by Dyness to operate Except for changing the DIP mode any other operations cannot be done Figure2 3 DIP switch mode schematic diagram 1 If the host is the latest B3 battery with DIP switch 1 The communication cable from the host CAN IN to the inverter comm port should be the correct one 2 When the battery works with GOODWE Solis LU...

Page 12: ... a special commnunication device of some no communication inverter it s a specia firmware in BMS different from general firmware so if customers want to use ICC please contact dyness to confirm Note 1 After the whole system connection set the master DIP mode according to the inverter model firstly then start the battery 2 The BAT INV comms cable is from inverter comm port to master CAN IN port BAT...

Page 13: ...eased after rated time delaying Over Current Protection in Discharging When the discharge current is greater than the protection value the battery buzzer alarms and the system stops discharging Protection is released after rated time delaying Note The buzzer sound alarm setting can be manually turned off on the background software and the factory default is on 2 4 3 Temperature Protection Less Ove...

Page 14: ... devices should also be switched off Distribution cable wiring should be reasonable and has the protective measures to avoid touching these cables while operating power equipment when installing the battery system must wear the protective items below The isolation gloves Safety goggles Safety shoes 3 1 1 Environmental requirements Working temperature 10o C 55o C Charging temperature range is 0o C ...

Page 15: ...interface of the user s photovoltaic power generation equipment is less than the maximum charging current of the products used in Table 2 2 the DC power interface of the user s photovoltaic power generation equipment shall have a current limiting function to ensure the normal operation of the user s equipment Verify that the maximum operating current of the battery powered user equipment inverter ...

Page 16: ...s follows Item Specification mm Quantity Figure 2B3 3B3 4B3 5B3 6B3 Cabinet 600 520 1140 1 1 1 1 1 Battery module B3 48V745h 480 405 132 2 3 4 5 6 Parallel cable positive Red 25mm2 L215 mm 1 2 3 4 5 Parallel cable negative Black 25mm2 L215 mm 1 2 3 4 5 Power cable positive1 Red 25mm2 L370 0mm 1 1 1 1 1 Power cable positive2 Red 25mm2 L270 0mm 1 1 1 1 1 Power cable negative1 Black 25mm2 L370 0mm 1 ...

Page 17: ...acity Wiring Make sure the power line and ground wire are reasonable Not easy to short circuit water and corrosion Circuit breaker Install circuit breaker between the battery system and the inverter Select the circuit breaker based on the actual battery system usage and installation suggestions 3 2 Equipment installation The wall for battery installation shall be solid brick or cement wall with st...

Page 18: ...inverter 1 Wiring the battery system Power cable positive and Power cable positive to the circuit breaker between the inverter and battery system 2 Connect the Communication cable to inverter 3 2 1 Installation preparation 1 Prepare equipment and tools for installation 2 Check the cabinet and confirm that the ON OFF switch on the front panel of each battery module is in the OFF state to ensure no ...

Page 19: ...etwork cable connector Reserve Interface 4 RJ45 network cable connector CAN RS485 communication interface Factory default CAN communication mode Interface 5 Power cable positive waterproof connector The battery DC output positive pole Interface 6 Power cable positive waterproof connector Reserve Figure3 2 2 Place the battery unit on the cabinet bracket as shown in the figure and push it into the c...

Page 20: ...and negative poles of the opposite terminal It is better to add a circuit breaker between the inverter and the battery system The selection of the circuit breaker requires Voltage U 60V Current I Inverter power 45V The circuit breaker is installed between the battery module and the inverter as shown in Figure 3 8 Caution Note If you have any questions during installation please contact your dealer...

Page 21: ... the IN communication port of No 2 battery module on the next layer Connect all communication lines in this order Foot position Color Definition PIN1 Orange white 485B PIN2 Orange 485A PIN3 Green white GND PIN4 Blue CANH PIN5 Blue white CANL PIN6 Green Reserve PIN7 Brown white XIN PIN8 Brown Reserve PIN9 Orange white Reserve PIN10 Orange Reserve PIN11 Green white GND PIN12 Blue CANH PIN13 Blue whi...

Page 22: ...le positive2 and the total negative cable Power cable negative1 and Power cable negative2 that are pulled out from the outside of the cabinet to the circuit breaker the other end of the circuit breaker is connected to the inverter and the external CAN communication line 2 Communication cable to inverter2 is connected to the inverter Complete as shown in Figure 3 8 Batteries and inverters must be i...

Page 23: ...cable negative Communication parallel cable Ground cable Power cable positive 2 Parallel cable positive Communication cable to inverter2 Circuit breaker Inverter Communication cable to inverter1 Power cable negative1 Power cable positive 1 Power cable negative2 ...

Page 24: ...ntact the dealer timely 2 Use a voltmeter to measure whether the voltage of the circuit breaker battery access terminal is higher than 42V and check whether the voltage polarity is consistent with the inverter input polarity If the circuit breaker battery input terminal has a voltage output and is greater than 42V then the battery begun to work normally 3 After confirming that the battery output v...

Page 25: ...er start Start charging Cell voltage undervoltage RED Buzzer start Start charging 4 3 Analysis and treatment of common faults Analysis and treatment of common faults in the Table 4 2 Table 4 2 Analysis and treatment of common faults No Fault phenomenon Reason analysis Solution 1 The indicator does not respond after the power on Total voltage lower than 35V Check the total voltage 2 No DC output Ba...

Page 26: ...cation cable used incorrectly The communication cable is incorrectly connected at the battery communication port or the inverter communication port The battery firmware version is too low to support the inverter Check these possible cause one by one If you need any technical help or have any question please contact the dealer in time ...

Page 27: ...IN NEW ENERGY TECH TAIZHOU Co LTD Address Building 13 Jiangyan Industrial Park Sanshui Street Jiangyan District Taizhou City Jiangsu Province 225500 Email sales dyness tech com Website www dyness tach com ...