POWERCUBE User Manual
15
3.1.5 Engineering coordination
Attention should be paid to the following items before construction:
Power line specification.
The power line specification shall meet the requirements of maximum discharge
current for each product in table2-2.
Mounting space and bearing capacity.
Make sure that the battery has enough room to install, and that the battery rack
and bracket have enough load capacity.
Wiring.
Make sure the power line and ground wire are reasonable. Not easy to short-circuit,
water and corrosion.
Circuit breaker.
Install circuit breaker between the battery system and the inverter,Select the circuit
breaker based on the actual battery system usage and installation suggestions.
3.2 Equipment installation
The wall for battery installation shall be solid brick or cement wall with strong bearing capacity
and wall thickness no less than 100mm.
Mounting space requirements
:
floor installation
Communicati
on cable-to
inverter-2
Black/L2000m
m/ Double
RJ45 plug
1
1
1
1
Ground wire
L500mm,4mm
²
1
1
1
1
1