6.
Turn the left exciter shaft (2) by 180° and hold it in this posi-
tion.
7.
Install the new toothed belt (1).
8.
Use a suitable tool (e.g. spring balance) with a tensile force
of 90 – 120 N (66 – 89 lbs) to pull the coupling upwards until
the required compression measurement is reached.
ð
Compression measurement:
10 - 15 mm (0.4 - 0.6 in).
9.
Tighten the fastening screws (1).
10.
Fasten the cover with screws.
2
1
B-834-0277
Fig. 114
Tensioning the toothed belt
90 – 120 N
66 – 89 lbs
1
1
B-834-0273
Fig. 115
Maintenance – Annually
DTR100
100
Summary of Contents for DTR100
Page 2: ...2 ...
Page 6: ...Table of contents DTR100 6 ...
Page 7: ...1 Introduction Introduction DTR100 7 ...
Page 11: ...2 Technical data Technical data DTR100 11 ...
Page 15: ...3 Concerning your safety Concerning your safety DTR100 15 ...
Page 43: ...4 Indicators and control elements Indicators and control elements DTR100 43 ...
Page 48: ...Indicators and control elements Engine DTR100 48 ...
Page 49: ...5 Checks prior to start up Checks prior to start up DTR100 49 ...
Page 57: ...6 Operation Operation DTR100 57 ...
Page 70: ...Operation Parking the machine in secured condition DTR100 70 ...
Page 71: ...7 Loading transporting the machine Loading transporting the machine DTR100 71 ...
Page 76: ...Loading transporting the machine After transport DTR100 76 ...
Page 77: ...8 Maintenance Maintenance DTR100 77 ...
Page 111: ...6 Check the oil levels 7 Clean the machine thoroughly Maintenance As required DTR100 111 ...
Page 112: ...Maintenance As required DTR100 112 ...
Page 113: ...9 Troubleshooting Troubleshooting DTR100 113 ...
Page 121: ...10 Disposal Disposal DTR100 121 ...
Page 123: ......
Page 124: ......