32
CA 252/302/402 M252EN6
EVERY 2000 OPERATING HOURS (YEARLY)
Fig. 57 Aircondition
1. Cooling element
2. Drain valve (x2)
Air conditioning (Optional)
– Overhaul
Fig. 56 Cab
1. Condenser element
1
1
2
Regular inspection and maintenance are necessary to
ensure satisfactory long-term operation.
Clean the condenser element (1) free from dust with
the aid of compressed air. Blow from above.
The air jet could damage the flanges of the
elements if it is too powerful.
Wear protective goggles when working
with compressed air.
Inspect the fastening of the condenser element.
Clean the cooler unit and the cooling elements (1) free
from dust with the aid of compressed air.
Inspect the system hoses for chafing. Make sure that
drainage from the cooling unit is unobstructed so that
condensation does not accumulate inside the unit.
Check the drain by squeezing the valves (2)
underneath the cab.