background image

  4

GENERAL

 

 

The DYNAPAC ride on double floats BG70 is designed for large surfaces trowelling.

 

Working width 1830mm 72" feature two four blades rotors.

 

 

DESIGN

 

 

BG70 is driven by a twin cylinder four strokes petrol engine (1).

 

It is equipped with a safety switch which stops the engine if the operator leaves the seat (2).

 

The engine power is transmitted to the rotors supporting the blades (3) through a centrifugal clutch, two V belts, a 
drive shaft and two reduction gear boxes (4).

 

The blades are protected by a guard ring (5).

 

Blade speed can be smoothly adjusted from 70 to 160 rpm by the throttle pedal (6).

 

Three powerful halogen lights (7) permit precision finishing in poorly lit conditions.

 

Blade pitch control (8) carried out manually allows adjustment of blades pitch.

 

Two adjustable control levers (9) accurately and easily steer the BG double float.

 

The retardant spray system (10) allows operator to apply a fine spray of retardant on the slab during the finishing 
operation. The retardant is stored in a tank mounted on the rear of the machine. The spray system is activated when 
a button on the left control lever (9) is pressed.

 

It is equipped with an electric start supplied with a battery (11). 
 

 
 
 
 

2. Seat 

3. Blades 

5. Guard ring 

6. Throttle pedal 

7. Halogen light 

8. Control levers 

9. Blade pitch control 

 
 
 
 

 
 
 
 
 

1. Petrol engine 

4. Reduction gear box 

10. Spray system 

11. Battery 

12. Fuel tank 

13. Hour meter / tachometer 

14. Ignition switch key 

15. Lights switch 

 

 

12 

11

10 

13

14 

15 

RAMIRENT

Summary of Contents for BG70

Page 1: ...DYNAPAC CONCRETE EQUIPMENT BG70 Power Floats INSTRUCTIONS SPARE PARTS CATALOGUE BG70 IS 10682 ENG R A M I R E N T ...

Page 2: ...e machine is restricted to the applications specified in the product literature Always change damaged parts immediately Change wear parts in due time SAFETY EQUIPMENT WARNING The admissible sound level of 85 dB A can be exceeded because of the machine and or the application Long time exposure to loud noise without ear protectors can cause permanent damage to hearing Long time exposure to vibration...

Page 3: ...tuations Keep away from all hot or spark generating objects do not smoke when handling fuel Wait until the machine has cooled before filling the tank Avoid spilling petrol or diesel on the ground STARTING THE MACHINE CAUTION Before starting make yourself familiar with the machine and make sure that the machine does not show any obvious faults Then start the machine according the instruction and sp...

Page 4: ...ision finishing in poorly lit conditions Blade pitch control 8 carried out manually allows adjustment of blades pitch Two adjustable control levers 9 accurately and easily steer the BG double float The retardant spray system 10 allows operator to apply a fine spray of retardant on the slab during the finishing operation The retardant is stored in a tank mounted on the rear of the machine The spray...

Page 5: ...ardant spray system Hour meter Set of 8 blades 3 Halogen lights Lifting hooks OPTIONS Set of 2 smoothing disks Transport trolley OPERATING INSTRUCTIONS BEFORE STARTING Check engine oil level Make sure that all blades are at the same angle If necessary adjust the blade angle Make sure that the safety switch works properly STARTING ALWAYS HAVE THE THROTTLE PEDAL AT IDLE WHEN STARTING ENGINE Take pla...

Page 6: ...er to the engine instruction book Check oil in reduction gear box by removing check plug at side of gear box Refill as needed with SAE 140 160 gear oil Clean air filter foam cover Check blade pitch adjustment for proper operation Check safety switch for proper operation WEEKLY 50 hours Check belts tension Check blades for excessive wear If necessary reverse or replace the blades Change engine oil ...

Page 7: ...7 WIRINGS DIAGRAM R A M I R E N T ...

Reviews: