23
UVCS LED Light-Curing Conveyor Systems User Guide
Figure 32. Two M4x8
Screws
Figure 33. M4x25 Screw
Figure 34. Three M4x8
Screws
4.
Remove all tension from the belt by fully backing off the belt-tension adjustment knobs (Figure 31).
5.
Position the belt splice to the end of the conveyor (Figure 35). Remove the fiberglass rod that ties the
ends of the belt together (Figure 36). Remove the belt.
6.
Run the new Belt around the conveyor frame (Figure 37).
7.
Install the fiberglass rod through the belt loops.
8.
Apply some adhesive to both ends of the fiberglass rod to prevent it from moving during conveyor
operation (Figure 38).
Figure 35. Spliced End of Belt
Figure 36. Fiberglass Rod
Figure 37. Replacing Belt
Figure 38. Applying Adhesive