background image

 

 

 

 

DX3 ENTERPRISES LTD. 

102, 1289 - 91 Street SW, Edmonton, AB, Canada, T6X 1H1 

Toll Free: 866-796-0303    Tel: 780-756-0300    Fax: 866-821-3732     

www.DX3solarlighting.com

 
 

   

 

Wood Pole Solar System Installation 

 
 
 

 

 

 

 

Mount  the  solar  panel  to  the 
solar  mount  using  the  pre-drilled 
mounting  holes  with  the  4  ea. 
5/16”  x  3/4”  bolts,  washers  and 
lock nuts

.

 (Fig. 1) 

 

Drill 2 ea. 

” holes, 9” c-c 

spacing through the wood pole 
near the top. The orientation for 
these holes will be North/South 
when the pole is erected. 
(Fig. 2) 

 

Mount assembled solar panel 
frame to the wood pole with the 
supplied 

” x 18” Stainless steel 

ready rod, flat

 

washers and nylon 

lock nuts. Ensure that the solar 
panel will be facing south when 
the pole is erected.

 

 (Fig. 2) 

Fig. 1 

Fig.2 

Fig.3 

 

Drill 2ea. 

” holes, 9” c-c spacing through the wood pole 

below the solar panel mount. The hole location will be 
dependent on site requirements. The orientation for these 
holes is determined by the direction the pole arm is to be 
mounted. (Fig. 2) 

 

Mount the battery box and pole arm to the wood pole with the 
supplied 

” x 18” Stainless steel ready rod, flat washers and 

nylon lock nuts. The battery box can be mounted on the 
opposite side of the pole or same side as the pole arm 
depending on site conditions. (Fig. 3)

 

 

  

*order of operation may be altered depending on whether the system is assembled on 
the ground and erected complete or assembled in place with the pole already standing
 

Reviews: