- 36 -
Installing the Capacity Hat on the Antenna
1. Mark the bottom of the Capacity Hat Assembly 3-1/4” from the bottom end.
2. Slide a
DXE-ECL-1000
element clamp over the 1” OD element tube at the top of the antenna.
Slide the completed capacity hat assembly into the 1” OD element tube to the 3-1/4” mark.
Tighten the
DXE-ECL-1000
clamp in place. Do not over-tighten which may cause clamp
damage. Alignment of the Capacity Hat Assembly in regards to the overall antenna assembly is
discussed later in the manual in the Guying section.