background image

 

 

 

 

CHOOSING THE PLACE OF INSTALLATION: 
 

Waste water resulting from the regeneration must be 
funneled into the floor sink by the flexible pipe. 
If  the  floor  sink  is  placed  higher  than  the  water 
softener,  the  maximum  height  acceptable  is  1.8 
metres,  provided  that  the  pipe  is  not  longer  than  5 
metres  and  the  pressure  of  the  water  system  is  at 
least 2.8 bar. 
If  the  water  softener  is  near  a  boiler,  check  that  the 
pipes and the water softener itself are not  subjected 
to overheating. If possible, install a pipe that keeps a 
few  meters’  distance  (at  least  3)  between  the  outlet 
of the water softener and the inlet of the boiler. 
Keep away from corrosive or acid products. 

 

CONNECTION TO THE DRAIN SYSTEM (A)

The drain pipe is not flattened or bent, as water should 
flow without impedements. 

 

THE OVERFILL PROTECTION PIPE (B)  
 

Insert flexible pipe in the quick joint, then connect the 
pipe to a floor sink that must be placed under the quick  
joint, because the water that may come out will  
not be pressurized. 
 

 
ELECTRIC AND ELECTRONIC COMPONENTS: 
 

A-OPTICAL SENSOR 
B-AC ADAPTER INPUT 
C-MAIN MOTOR & OPTICAL SENSOR 
D-VOLUMETRIC TURBINE INPUT 
E-CHLORINE GENERATOR OUTLET 
 

 

 

Summary of Contents for GIX Series

Page 1: ...Height mm 515 540 650 Weight Kg 11 12 15 Cylinder capacity l 5 8 12 Liters of resin l 3 5 5 5 9 Nominal flow rate at 4 bar 1500 l h Room temperature Min 4 C Max 35 C Feed water temperature Min 6 C Max 25 C Pressure of feed water 0 2 0 8 MPa 2 8 bar Power supply INPUT 230V 50 60 Hz standard 120V 60 Hz optional Absorbed power 4W ...

Page 2: ...epletion Typically during operation its display shows the actual time the current date and the number of litres remaining before a regeneration cycle During a regeneration cycle the display shows the time needed before completion as well as the phase it is in It is possible to lock the displayed information so as to avoid any hazardous data modification INSTALLATION INSTRUCTIONS We suggest install...

Page 3: ...ating If possible install a pipe that keeps a few meters distance at least 3 between the outlet of the water softener and the inlet of the boiler Keep away from corrosive or acid products CONNECTION TO THE DRAIN SYSTEM A The drain pipe is not flattened or bent as water should flow without impedements THE OVERFILL PROTECTION PIPE B Insert flexible pipe in the quick joint then connect the pipe to a ...

Page 4: ...t during a regeneration cycle Such device uses salt so as to carry out resin disinfection If salt is not present the device will not start Once the regeneration cycle is over an orange led light will turn on this means that salt shall be added in brine MAINTENANCE FOR THE INSTALLER For the equipment to work in optimal conditions we suggest performing the following operations periodically Clean the...

Page 5: ...er only consists in refilling the brine periodically with sodium chloride NaCl common salt If salt is lacking the water softener will not be able to soften the water AMOUNT OF SALT GIX5V GIX8V GIX12V Salt of regeneration kg 0 6 1 1 5 Salt in the brine tank kg 10 20 25 LITRES OF SOFT WATER BASED ON WATER HARDNESS f d ppm CaCO3 20 11 200 30 16 300 40 22 400 50 28 500 60 33 600 Cyclic Capacity m 3 f ...

Reviews: