
Electric Boosted Solar
25
H3163 025247 Rev. C
Tick
Task
See Step No.
Installer’s Guide read
1
Safety audit conducted
2
Existing tank removed
3
New storage tank safely positioned on a level surface
4
Cold and hot water pipes connected
5
Collectors aligned and attached to roof
6 – 11
Fittings attached to collectors
12 – 16
4 Way Union Assembly fitted
17
Anti-Frost Valve fitted
18
Roof penetration sealed with a flexible waterproof flashing
19
Temperature sensor installed
20 – 21
Non return valve fitted
22
PTR valve fitted
23
GPO installed
24
Tempering valve fitted
25
Commissioning the water heater
26
Commissioning Checklist