5
DN 50
G¾“ / G½“ AG
DIN ISO 228
DN 50
B
B
5
DN 50
G¾“ / G½“ AG
DIN ISO 228
DN 50
B
B
14
PluMbInG InStallatIon
Equipment:
•
The Step-in Spa Music is prepared to be ready for connection
•
All models are fitted with a frame including bathtub feet, as well as a drain and an overflow.
•
All bathtubs have a functional and leak test completed at the factory before they are delivered.
Installation preparation:
•
Clean the area below the bathtub thoroughly in order to prevent any debris being drawn into the an.
•
Only install the bathtub on a surface which is suitable for use in a wet room (tiled or sealed floor)
•
Soundproofing: When installing, pay attention to DIN 4109 or SIA 181 (soundproofing in building
construction)
Installation:
•
The height of the Step-in Spa Music can be adjusted to level it
•
Seal all open joints with plumber's silicone after completing work
Water connection:
•
If the drain and overflow fittings are installed with an integrated bathtub water inlet, the
manufacturer's specifications must be observed.
•
The connection to the water supply must be carried out by a licensed plumber. The installation
must be done in accordance with DIN EN 1717 (pipe interrupter).
All other country-specific regulations must be observed.
Summary of Contents for ShowerLux Step-in Sparkling + Music
Page 9: ...5 DN 50 G G AG DIN ISO 228 DN 50 B B 6 220V A B A B 9 Wannenmontage...
Page 19: ...5 DN 50 G G AG DIN ISO 228 DN 50 B B 6 220V A B A B 19 Installation Instructions...
Page 29: ...5 DN 50 G G AG DIN ISO 228 DN 50 B B 6 220V A B A B 29 Instruction de montage...
Page 39: ...5 DN 50 G G AG DIN ISO 228 DN 50 B B 6 220V A B A B 39 IstruzionE di montaggio...
Page 42: ...www duscholux com...