12. Start-up
Carryoutanelectricalsafetycheckbe-
forestart-upandinitialuse
•Closethecovertothecontrolunitandattach
theconnectiontoground
•Mainsfusing"ON
•Theblackstartswitchmustbeinthedown
positionforthemotorprotectionswitchofthe
controlPCB(50)
•Setthebutton(62)ofthepressureswitchto"I
Auto"
ThePTSwithdisplayhasnosuch
switchThepressuresensoristobe
foundonthecontrolPCB
•Operatethemainswitch(a),thecompressor
startsupandthenswitchesoffatc75bar
•Openthecondensatetap(60)anddrainoff
thecondensationpresent
•Checkthesafetyvalve
Whencarryingoutthistestthetank
mustbeunderpressure(maximum75
bar)
•Openthescrew(61)ofthesafetyvalveuntil
thevalveventsAllowthesafetyvalvetovent
onlybrieflyandthenclosethescrewagain
Thevalvemustnowbeinitsclosedposition
Danger of damage
Do not use the safety valve in order
to vent the pressure tank.
The safety valve has been factory
set at 10 bar, checked and approved
(with stamp). It must not be tam-
pered with.
62
61
Summary of Contents for PTS 200
Page 1: ...EN 9000 619 14 30 2012 02 Dürr Dental PTS 200 Installation and Operating Instructions ...
Page 2: ......
Page 24: ...EN 24 2012 02 PTS 200 13 Connection media plan 13 1 Set up with VS units ...
Page 25: ...EN 2012 02 25 PTS 200 PC board 13 2 Set up with a display ...
Page 26: ...EN 26 2012 02 PTS 200 13 3 Set up with V units ...
Page 32: ...EN 32 2012 02 400 V 3 part 2 Bleeder valve ...
Page 33: ...EN 2012 02 33 400 V 3 part 3 Display Top Optional Hose manifold con trol switch ...
Page 38: ...EN 38 2012 02 Model type 230V 1 2 aggregates part 3 24 VAC Hose manifold con trol contact ...
Page 47: ......