Checking the machine zero point
Service Instructions 911-210-10 - 00.0 - 06/2020
63
13 Checking the machine zero point
The machine zero point is factory-set to the correct value.
Fig. 49: Checking the machine zero point
Gage required: Clamp with test bores.
To check the machine zero point:
1.
Press
Extras
>
Service
>
Multitest (Multi test)
.
2.
Press
Transportklammer (Transport clamp)
.
3.
Assemble the clamp with test bores (1).
4.
Press
Referenzieren (Referencing)
.
The machine moves to the reference position.
5.
Press
Mittelpunkt (Center point)
.
The machine moves to the center position. The center of the needle
is positioned within the center point bore (2), and the tip of the needle
can be lowered into the bore by turning the arm shaft crank.
6.
Press
Test
.
The machine moves to the test position. The center of the needle is
positioned within the test bore (3), and the tip of the needle can be
lowered into the bore by turning the arm shaft crank.
(1)
- Clamp with test bores
(2)
- Center point bore
(3)
- Test bore
①
③
②
Summary of Contents for 991-210-10 Series
Page 1: ...911 210 10 Service Instructions...
Page 10: ...About these instructions 8 Service Instructions 911 210 10 00 0 06 2020...
Page 136: ...Decommissioning 134 Service Instructions 911 210 10 00 0 06 2020...
Page 138: ...Disposal 136 Service Instructions 911 210 10 00 0 06 2020...
Page 146: ...Troubleshooting 144 Service Instructions 911 210 10 00 0 06 2020...
Page 149: ......